Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » From the Archives: April 16, 1959
Industry News

From the Archives: April 16, 1959

Machinery AsiaBy Machinery AsiaMarch 24, 2026No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This cover image from April 1959 shows a right-of-way for the Trans-Canada Highway being cut through a section of the Canadian Rockies in British Columbia.

This 143-mile section was the most difficult to build of the entire 4,470-mile route, which stretched from St. Johns, Newfoundland on the Atlantic Ocean to Vancouver, BC on the Pacific Coast.

Many of the workers in this segment were hard rock miners, blasting the sides of steep slopes 500 feet to 1,500 feet above the roaring Kicking Horse River and turbulent Fraser River.

Where the route passed through Glacier and Revelstoke National Parks and Rogers Pass, avalanches and snow slides were real dangers. At one point in the project, explosives placed to trigger avalanches as a test were eaten by grizzly bears before they could be detonated.

More than 4,000 feet of snow covers made of wood or reinforced concrete protected the most vulnerable sections of the highway. The treacherous conditions of the saturated soil around the bridge piers near Terrace Bay, Ontario called for an unusual solution. Electroosmosis was used to stabilize the wet, fine-grained soils while the foundations were being built.

The technique involved establishing a direct current between electrodes placed in the ground to induce the flow of water, along with ions, from the anode to the cathode. This controlled direction of seepage forces reduced the water content of the soil, changing its chemical composition and successfully stabilizing the soil. Construction took nine years, with the highway opening in 1960.

This cover image from April 1959 shows a right-of-way for the Trans-Canada Highway being cut through a section of the Canadian Rockies in British Columbia. This 143-mile section was the most difficult to build of the entire 4,470-mile route, which stretched from St. Johns, Newfoundland on the Atlantic Ocean to Vancouver, BC on the Pacific Coast.

Looking for quick answers on construction and engineering topics?
Try Ask ENR, our new intelligent AI search tool.

Ask ENR →

Many of the workers in this segment were hard rock miners, blasting the sides of steep slopes 500 feet to 1,500 feet above the roaring Kicking Horse River and turbulent Fraser River. Where the route passed through Glacier and Revelstoke National Parks and Rogers Pass, avalanches and snow slides were real dangers.

At one point in the project, explosives placed to trigger avalanches as a test were eaten by grizzly bears before they could be detonated. More than 4,000 feet of snow covers made of wood or reinforced concrete protected the most vulnerable sections of the highway. The treacherous conditions of the saturated soil around the bridge piers near Terrace Bay, Ontario called for an unusual solution.

Electroosmosis was used to stabilize the wet, fine-grained soils while the foundations were being built. The technique involved establishing a direct current between electrodes placed in the ground to induce the flow of water, along with ions, from the anode to the cathode.

This controlled direction of seepage forces reduced the water content of the soil, changing its chemical composition and successfully stabilizing the soil. Construction took nine years, with the highway opening in 1962.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleInterior deploys $889 million for western water systems as capacity losses mount
Next Article States, municipalities join massive EPA demand to repeal climate harm finding
Machinery Asia
  • Website

Related Posts

John Deere is betting that building connected roads is its next competitive advantage

June 27, 2026

Buildots launches Intelligence Lab, an AI-powered project data research center

June 26, 2026

$26.2M North Texas EOC Debuts as World Cup Command Center

June 26, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

John Deere is betting that building connected roads is its next competitive advantage

Buildots launches Intelligence Lab, an AI-powered project data research center

$26.2M North Texas EOC Debuts as World Cup Command Center

Buildots launches Intelligence Lab, an AI-powered project intelligence center

Popular Posts

John Deere is betting that building connected roads is its next competitive advantage

June 27, 2026

Buildots launches Intelligence Lab, an AI-powered project data research center

June 26, 2026

$26.2M North Texas EOC Debuts as World Cup Command Center

June 26, 2026

Buildots launches Intelligence Lab, an AI-powered project intelligence center

June 26, 2026
Heavy Machinery

What to check before towing a car trailer in the summer

June 24, 2026

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.