Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Tennessee’s $2.1 million NFL stadium breaks ground
Industry News

Tennessee’s $2.1 million NFL stadium breaks ground

Machinery AsiaBy Machinery AsiaNovember 21, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

The Tennessee Builders Alliance celebrated breaking ground on the $2.1 billion New Nissan Stadium future home of the NFL’s Tennessee Titansaccording to a news release from Turner Construction.

Friday’s event marked the laying of the final beam on the Nashville, Tenn., project, which began in March 2024. The venue is scheduled to open in 2027.

The the construction group consists of de Turner, based in New York City; Indianapolis-based AECOM Hunt; Brentwood, Tenn.-based Polk & Associates Construction; and Nashville’s own ICF Builders and Consultants.

Construction crews placed more than 12,400 beams totaling 18,000 tons of steel and poured approximately 98,000 cubic yards of concrete for the 1.8 million square foot stadium structure. Crews will then begin installing the ethylene tetrafluoroethylene roof system. ETFE, a translucent material often used in stadium domeslets in sunlight while providing climate control for fans.

The project owners intend for Nissan Stadium to serve as a year-round destination and host multiple events, including college and professional football, concerts and civic events. The design incorporates a translucent roof, 360-degree outdoor porches and a 12,000-square-foot community space.

TBA and the Titans say they have prioritized opportunity and workforce inclusion at every stage. To date, the project team has logged 3.6 million hours worked by approximately 1,800 on-site workers each day. Of this total, 18.5% of the hours have been completed by residents of Nashville’s promised areas: regions of the city with high poverty that receive federal support. Over $110 million has been paid out Disadvantaged business enterprisesaccording to the release from Turner, which represents nearly 100 women- and minority-owned small businesses.

Through more than 120 community engagements and job events across Middle Tennessee, the project team connected local residents to construction careers. The Titans Construction Training Camp program graduated 96 participants, according to the release, across eight cohorts, with more than three-quarters receiving job offers upon completion.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleEnergy-based security metrics: three accounts of how to get started
Next Article Construction begins to increase by 21%, led by multimillion-dollar projects
Machinery Asia
  • Website

Related Posts

$11.5 million Brenner Base Tunnel nears end of tunnel excavation

February 27, 2026

Tariffs boosted construction input prices until the start of 2026

February 27, 2026

UPDATED: No easy fix for Potomac River sewage spill, now estimated at $20 million

February 27, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

$11.5 million Brenner Base Tunnel nears end of tunnel excavation

Tariffs boosted construction input prices until the start of 2026

UPDATED: No easy fix for Potomac River sewage spill, now estimated at $20 million

WSP warns against ‘AI hysteria’ in Q4 earnings call

Popular Posts

$11.5 million Brenner Base Tunnel nears end of tunnel excavation

February 27, 2026

Tariffs boosted construction input prices until the start of 2026

February 27, 2026

UPDATED: No easy fix for Potomac River sewage spill, now estimated at $20 million

February 27, 2026

WSP warns against ‘AI hysteria’ in Q4 earnings call

February 27, 2026
Heavy Machinery

Aluminum car transport trailer for long distance towing and transport of heavy vehicles

February 25, 2026

Why your white utility trailer rusts too quickly and how to choose one that really lasts

February 25, 2026

Best winch for car trailer

February 24, 2026

Aluminum tandem axle utility trailer for heavy hauling and long term value

February 24, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.