Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home ยป Watchdog demands records of White House ballroom project
Industry News

Watchdog demands records of White House ballroom project

Machinery AsiaBy Machinery AsiaDecember 23, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

A government watchdog group has filed a lawsuit seeking records related to the construction of the planned White House State Ballroom, adding a new transparency dispute to a project already facing multiple legal and preservation challenges.

Public Citizen filed the lawsuit Dec. 22 in the U.S. District Court for the District of Columbia, alleging that the White House and the U.S. Department of the Interior failed to respond to a Freedom of Information Act request seeking documents related to the ballroom project, including records related to planning, approvals and contracting, according to the complaint and a report by Politico Pro Energy and Environment.


RELATED

Court documents push the White House ballroom project into a new phase


“The White House has hidden the truth about how the Park Service is being used as a tool to facilitate Trump’s shady ballroom financing scheme,” said Jon Golinger, democracy advocate at Public Citizen. “But the American people have a right to know who is doing what in the House of the People and we will find out the facts.”

The lawsuit does not seek to stop construction directly, but takes aim at the paperwork underlying the project, which involves demolishing the historic East Wing and building a roughly 90,000-square-foot ballroom on federal property. Although the project is privately funded, it is being built within the White House complex, raising questions about how federal oversight, disclosure requirements and preservation laws apply.


RELATED

White House lounge construction progresses as oversight gaps emerge


Wendy Liu, an attorney with the Public Citizen Litigation Group and lead counsel on the case, said the lawsuit focuses on mandatory compliance with federal transparency laws. “The Trump administration’s failure to respond to this FOIA request reflects its more general disregard for transparency,” Liu said. “The Trump administration is withholding information that the American people have a right to know.”

The FOIA dispute comes amid ongoing litigation brought by preservation groups that question whether required federal reviews were completed before demolition began. In recent court filings reviewed by ENR, the Trump administration has argued that construction should continue while these cases play out, warning that stopping work midstream would impose cost and logistical risks.

In a statement filed in a separate preservation lawsuit, White House spokesman Davis Ingle said the administration has broad authority to continue the work. “President Trump has full legal authority to modernize, renovate and beautify the White House, just as all his predecessors did,” Ingle said.

For contractors and designers, the latest lawsuit underscores the project’s exposure to non-technical risk tied to transparency and governance, even as physical construction progresses. The case also raises broader questions about how FOIA obligations apply to privately funded construction at federal sites and what documentation must be publicly disclosed for high-profile government facilities.

Public Citizen is asking the court to compel agencies to produce sensitive records and meet FOIA deadlines. The White House and the Department of the Interior have not publicly commented on the lawsuit since its publication.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleTexas Supreme Court Rules for Highway Contractors in Critical Legal Immunity Test
Next Article Deere acquires Tenna equipment tracking platform
Machinery Asia
  • Website

Related Posts

Industrial tracks for the week of December 29, 2025

December 23, 2025

Deere acquires Tenna equipment tracking platform

December 23, 2025

Texas Supreme Court Rules for Highway Contractors in Critical Legal Immunity Test

December 23, 2025
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Industrial tracks for the week of December 29, 2025

Deere acquires Tenna equipment tracking platform

Watchdog demands records of White House ballroom project

Texas Supreme Court Rules for Highway Contractors in Critical Legal Immunity Test

Popular Posts

Industrial tracks for the week of December 29, 2025

December 23, 2025

Deere acquires Tenna equipment tracking platform

December 23, 2025

Watchdog demands records of White House ballroom project

December 23, 2025

Texas Supreme Court Rules for Highway Contractors in Critical Legal Immunity Test

December 23, 2025
Heavy Machinery

The best car towing shift for safe, controlled and stress-free loading of vehicles

December 22, 2025

Aluminum tilt bed trailer explained for real world transportation needs

December 22, 2025

TYPHON Machinery Named eBay Exporter of the Year 2025, Cementing Its Leadership in Global Compact Equipment

December 19, 2025

Long-term durability where water meets road

December 15, 2025

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.