Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home ยป $1.15 million Great Lakes Dam enters construction phase
Industry News

$1.15 million Great Lakes Dam enters construction phase

Machinery AsiaBy Machinery AsiaJuly 15, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

Dive brief:

  • The States of Michigan and Illinois signed an agreement with the US Army Corps of Engineers for the construction of the Cosponsor $1.15 billion Brandon Road Interbasin Projectthat will prevent invasive carp and other aquatic nuisance species from entering the Great Lakes, according to a July 1 news release from Michigan Gov. Gretchen Whitmer’s office.
  • As part of the agreement, the project will receive $274 million in federal and $114 million in state funding for the first of three phases of work, according to the release. Work will focus around the Brandon Road lock and dam near Joliet, Illinois, which is a critical pinch point to prevent invasive fish from moving into the Great Lakes.
  • as work move towards the construction phaseContracts for manufacturing, continued design, downsizing deterrents and base withdrawal are slated for solicitation in the coming weeks, according to the USACE’s Rock Island District.

Diving knowledge:

The USACE said that if left untagged, the carp could outcompete native species and greatly harm ecosystems throughout the Great Lakes region and its more than $20 billion fishing and boating industries.

“We are excited to enter this next phase of the project and are committed to preventing the upward movement of invasive carp and other aquatic nuisance species in the Great Lakes,” said Col. Aaron Williams, the Rock Island District Commander for to USACE, to USACE, to the The news release.

Michigan and other Great Lakes states have been working with the U.S. Army Corps of Engineers on this project since 2011, the governor’s office wrote.

The Brandon Road Interbasin project will create structural and non-structural deterrents for invasive species to deter them from moving upstream, According to the USACE page. Structural measures include technologies such as a float lock, which is a channel designed with an electric barrier, the underwater acoustic deterrent, the air bubble curtain and an automated boat deterrent.

Non-structural measures focus on the people who use the Great Lakes. These steps include public education and outreach, integrated pest management, pesticides, and manual or mechanical removal.

“Today’s agreement will help us get shovels on the ground as soon as possible on the critical Brandon Road project,” Whitmer said in his office’s release.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleJOHN DEERE 9RX 640 Tractor
Next Article Doosan Articulated Dump Truck features FAMILY | Doosan Equipment Europe
Machinery Asia
  • Website

Related Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Amtrak updates $6 million Baltimore tunnel project

Trump unveils plans for $22.5 million Dulles airport overhaul

Turner’s cost benchmark rose 5.2% in the second quarter

Inspector dead, four workers injured in Kansas interstate construction zone crash

Popular Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026

Inspector dead, four workers injured in Kansas interstate construction zone crash

July 30, 2026
Heavy Machinery

What size car trailer load winch do you need?

July 29, 2026

How to choose a manual winch for your car trailer loading needs

July 27, 2026

How to choose heavy-duty car tow ramps for safe loading

July 27, 2026

What width car trailer do you need for your vehicle?

July 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.