Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home » Hensel Phelps wins $174 million contract for California border station
Industry News

Hensel Phelps wins $174 million contract for California border station

Machinery AsiaBy Machinery AsiaJuly 29, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

The expansion and modernization of the Calexico West Land Port of Entry in California is nearing its final phase as the US General Services Administration selected Hensel Phelps Construction Co. for a $173.6 million design-build contract. GSA is using $3.4 billion of Employment and Infrastructure Investment Act of 2021 for 26 US port of entry upgrade projects on the borders with Mexico and Canada.

The Calexico West border station is one of the busiest ports of entry between the US and Mexico, according to GSA. The land port processes about 20,000 northbound vehicles and 12,500 northbound pedestrians daily. TThe 17.8-hectare facility, which dates back to 1974, is not large enough to accommodate its volume of traffic, resulting in long wait times. Additionally, it no longer meets the security requirements of US Customs and Border Protection.

Plans for the final phase of the work call for a 39,000-square-foot pedestrian inspection building and six more pedestrian inspection booths, for a total of 12. GSA began requiring the use of construction materials with low carbon incorporated as part of the Biden administration. “Buy clean” initiative.. Officials say the material selections will reduce the project’s carbon footprint by 542 metric tons compared to using conventional materials. It is also planned that the building will use more efficient heat pumps.

“By incorporating advanced technologies and sustainable materials, we are ensuring the Calexico West land port of entry meets the highest standards of safety, comfort and environmental responsibility,” said Sukhee Kang, GSA’s Pacific Rim regional administrator, in a communicated

Work is scheduled to begin next year and be completed in the winter of 2028.

Hensel Phelps was also the general contractor for the first two phases of the project. Construction of the $98 million first phase began in 2015 and was completed in 2018. It included an operations building and passenger vehicle inspection facilities. The $191 million Phase 2A, which included construction of an administration building and expansion of inspection areas, began in 2020 and closed earlier this year.

Phase 2 was split into two parts due to available funding. The next work is financed with 122 million dollars from the Infrastructure Investments and Employment Lawin addition to about $44 million available for projects that use low-carbon incorporated materials and sustainable technologies.

Also using IIJA funds, GSA recently awarded a $94 million design-build contract to McGough Construction, St. Paul, Minnesota, for a building replacement project at the Dunseith Land Port of Entry in North Dakota. Construction is scheduled to begin next May and reach substantial completion by October 2027.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleThe One Ton TYPHON TERROR X STORM MINI EXCAVATOR – SUCCESSFUL PROJECTS AT A MINI SCALE
Next Article North America: CASE 580 EV Electric Backhoe at Work
Machinery Asia
  • Website

Related Posts

Skanska Begins $104 Million Johns Hopkins Library Reconstruction

February 2, 2026

Caterpillar’s Q4 sales hit record high and build momentum for 2026

February 2, 2026

Trump announces plan to renovate Kennedy Center

February 2, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Skanska Begins $104 Million Johns Hopkins Library Reconstruction

Caterpillar’s Q4 sales hit record high and build momentum for 2026

Trump announces plan to renovate Kennedy Center

Gilbane-Turner JV begins construction of $1.7 million New York Public Health Center

Popular Posts

Skanska Begins $104 Million Johns Hopkins Library Reconstruction

February 2, 2026

Caterpillar’s Q4 sales hit record high and build momentum for 2026

February 2, 2026

Trump announces plan to renovate Kennedy Center

February 2, 2026

Gilbane-Turner JV begins construction of $1.7 million New York Public Health Center

February 2, 2026
Heavy Machinery

Car hauler trailer kit basics for real world towing

January 26, 2026

Hydraulic tilting gooseneck trailer for transporting heavy equipment

January 26, 2026

Aluminum car trailer with tilt bed explained for real world vehicle transport

January 26, 2026

What is the best cover for a car trailer?

January 23, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.