Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home ยป Lane Construction lands $208 million naval base repair
Industry News

Lane Construction lands $208 million naval base repair

Machinery AsiaBy Machinery AsiaAugust 6, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

Award: Repair of airport taxiways
Value: 208 million dollars
Location: Virginia Beach, Virginia
Customer: Naval Facilities Engineering Systems Command Mid-Atlantic

Lane Construction Corp., based in Charlotte, North Carolina won a $208 million contract for taxiway pavement repairs at Naval Air Station Oceana in Virginia Beach, Va., the contractor said in a July 29 news release.

The contract will involve two phases: Phase 1 to repair the Alfa Road and Phase II to repair the Alfa Road, Bravo, Papa and other works related to the air station. Construction is expected to begin in the fall and be completed in 2028, according to Lane Construction.

Naval Facilities Engineering Systems Command Mid-Atlantic awarded the contract.

Lane Construction previously completed work at Naval Air Station Oceana. The contractor previously repaired Runway 14L-32R and its associated electrical lighting at the airfield and constructed new 4-foot-wide shoulders in areas with modified lighting systems.

It’s also Lane’s second recent win in Virginia. The contractor secured a $110 million contract earlier this year for the Newport News segment of the I-64 Hampton Roads Express Lanes, according to the release. Express lanes are intended to improve travel times for those driving on Virginia’s major interstate highways.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleOh My! The New Kubota BX2680 Tractor Review! BIG Improvements, Miscues, & The LA344 Loader Removal
Next Article JCB 3dx Backhoe Fully Loading Mud in 4wd Mahindra Arjun NOVO and Swaraj 744 with John Deere Dozar
Machinery Asia
  • Website

Related Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Amtrak updates $6 million Baltimore tunnel project

Trump unveils plans for $22.5 million Dulles airport overhaul

Turner’s cost benchmark rose 5.2% in the second quarter

Inspector dead, four workers injured in Kansas interstate construction zone crash

Popular Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026

Inspector dead, four workers injured in Kansas interstate construction zone crash

July 30, 2026
Heavy Machinery

What size car trailer load winch do you need?

July 29, 2026

How to choose a manual winch for your car trailer loading needs

July 27, 2026

How to choose heavy-duty car tow ramps for safe loading

July 27, 2026

What width car trailer do you need for your vehicle?

July 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.