Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home » California hands out $3.8 million to improve transportation
Industry News

California hands out $3.8 million to improve transportation

Machinery AsiaBy Machinery AsiaOctober 28, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

Dive Brief:

  • The Assigned California Transportation Commission $3.8 billion in funding for bridge, highway, rail and freight corridor improvements, according to an Oct. 21 news release.
  • Of the total, about $3.5 billion will come from the $1.2 trillion Jobs and Infrastructure Investment Act, with another $330 million coming from California Senate Bill 1, passed in 2017 to repair roads and other transportation infrastructure throughout the state. It provides approximately $5 billion annually in funding from a state gas tax.
  • About 600 local governments and regional transport authorities will receive money from the allocation, according to CTC. California has collected more than $46 billion in federal infrastructure funding since the passage of the IIJA in November 2021.

Diving knowledge:

The specific funding highlighted in the release includes:

  • $9.4 million to improve facilities along State Route 49 in Calaveras County to comply with the Americans with Disabilities Act. The funding will build new sidewalks, curb ramps and Class II bike lanes in the Angels Camp community.
  • $4.2 million to assist the San Joaquin Regional Railroad Commission / San Joaquin Joint Powers Authority in acquiring the right-of-way for the construction of the new Valley Madera Rail Station. The project will improve integration and connectivity with the state’s high-speed rail system.
  • $556,000 for improvements to pedestrian facilities in the neighborhood of Harrison Elementary School in San Joaquin County, including a Class II bike lane, construction of new sidewalks, a curb ramp, street lighting intersection and a traffic signal.
  • $185,000 for the Tuolumne County Transportation Board to build the Hetch Hetchy Railroad Trail project in Groveland.

Other projects getting an infusion include the Los Angeles-San Diego-San Luis Obispo rail corridor, four hydrogen fueling stations along Interstate 215 near Riverside, a freeway-to-freeway connector between state routes 99 and 58 in Bakersfield and a bike and pedestrian crossing. at Berkeley.

“These projects will create safer, more equitable and climate-resilient transportation options for all Californians,” Caltrans Director Tony Tavares said in the statement. “Investments made possible since the IIJA was enacted are establishing a legacy that will benefit all people who use and rely on our vast transportation system for employment and educational opportunities, access to goods and services, and connection to recreational attractions.” .

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleSafety, Merit — SW Airlines PHX Technical Operations Facility
Next Article Airport/Merit — Phoenix Mesa Gateway | Engineering News-Register
Machinery Asia
  • Website

Related Posts

Nonprofit construction education organization launches English language improvement program

February 3, 2026

Joint Venture Named for Second Phase of $809 Million Kansas Jayhawks Stadium Renovation

February 3, 2026

Gateway Project Officials Ask Feds For More Than $16 Million To Freeze Hudson Tunnel Funding

February 3, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Nonprofit construction education organization launches English language improvement program

Joint Venture Named for Second Phase of $809 Million Kansas Jayhawks Stadium Renovation

Gateway Project Officials Ask Feds For More Than $16 Million To Freeze Hudson Tunnel Funding

MTA invested a record $15.8 million in capital projects last year

Popular Posts

Nonprofit construction education organization launches English language improvement program

February 3, 2026

Joint Venture Named for Second Phase of $809 Million Kansas Jayhawks Stadium Renovation

February 3, 2026

Gateway Project Officials Ask Feds For More Than $16 Million To Freeze Hudson Tunnel Funding

February 3, 2026

MTA invested a record $15.8 million in capital projects last year

February 3, 2026
Heavy Machinery

How to choose a smart car trailer

February 3, 2026

Galvanized tilting trailer for the transport of cars and equipment

February 3, 2026

Car hauler trailer kit basics for real world towing

January 26, 2026

Hydraulic tilting gooseneck trailer for transporting heavy equipment

January 26, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.