Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » Airport/Merit — Phoenix Mesa Gateway | Engineering News-Register
Industry News

Airport/Merit — Phoenix Mesa Gateway | Engineering News-Register

Machinery AsiaBy Machinery AsiaOctober 28, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Phoenix-Mesa Gateway Airport Authority Terminal Modernization

Table, Ariz.

Merit Award


Sent by: McCarthy Building Cos.

Owner: Phoenix-Mesa Gateway Airport Authority

Main design company: DWL Architects

General contractor: McCarthy Building Cos.

Civil Engineer: Dibble Corp.

Structural Engineer: Martin White Griffis Structural Engineers Inc.

MEP Engineer: LSW engineers

Structural steel: JB Ventures Inc., dba JB Steel

Construction of temporary spring structure: JT2 Engineering and Construction




A $28 million effort revitalized five gates at Phoenix-Mesa Gateway Airport, providing expanded seating capacity, ADA-compliant accommodations, retail space and an outdoor patio, all in 18 months.

With an extension of 30,000 square meters, the modernization of the terminal improves the infrastructure of the airport for its increasing number of annual passengers. With the demolition of the previous terminal scheduled for January 2023, just prior to Super Bowl LVII, implementing an alternate gate facility to handle peak flight volumes was critical to both the project and the ‘increase in tourist traffic at the airport. The project team chose to build a 6,300 square meter three-door prefab structure while the original terminal was just welcoming its final passengers. Once the temporary structure was completed, passengers would be able to walk through an enclosed tunnel to the air-conditioned terminal. After the modernized terminal was completed, the temporary structure was torn down and stored at the airport for use in future expansion projects.

All operations were conducted airside, requiring extensive security measures for employees and business partners, emphasizing both construction and passenger safety.

Security clearance badges, strict visitor policies and gate procedures helped foster a trusting partnership between the airport and construction crews, allowing the project team to complete work on time and under budget in February 2024.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleCalifornia hands out $3.8 million to improve transportation
Next Article The $3.6 million Brent Spence Bridge project was sued over environmental concerns
Machinery Asia
  • Website

Related Posts

US Supreme Court sides with Trump to end protections for Haitians and Syrians

June 27, 2026

John Deere is betting that building connected roads is its next competitive advantage

June 27, 2026

Buildots launches Intelligence Lab, an AI-powered project data research center

June 26, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

US Supreme Court sides with Trump to end protections for Haitians and Syrians

John Deere is betting that building connected roads is its next competitive advantage

Buildots launches Intelligence Lab, an AI-powered project data research center

$26.2M North Texas EOC Debuts as World Cup Command Center

Popular Posts

US Supreme Court sides with Trump to end protections for Haitians and Syrians

June 27, 2026

John Deere is betting that building connected roads is its next competitive advantage

June 27, 2026

Buildots launches Intelligence Lab, an AI-powered project data research center

June 26, 2026

$26.2M North Texas EOC Debuts as World Cup Command Center

June 26, 2026
Heavy Machinery

What to check before towing a car trailer in the summer

June 24, 2026

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.