Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Merit Award, Small Project: Athletic Propulsion Labs
Industry News

Merit Award, Small Project: Athletic Propulsion Labs

Machinery AsiaBy Machinery AsiaNovember 12, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

APL – Athletic Propulsion Labs

New York City

Merit Award


Sent by: Schimenti Construction Co.

Owner: app

Main design: Al-Jawad Pike

General contractor: Schimenti Construction Co.

Structural Engineer: Eipel Engineering Group

MEP Engineer: Custom design and engineering

Architect of record: Tricarico Architecture and Design PC




The performance footwear brand’s Manhattan flagship store is a 3,800-square-foot amphitheater-shaped store in SoHo, a second location after its Los Angeles headquarters, that is a testament to craftsmanship and creation meticulous, according to the project team.

The walls are custom handmade clay-based plaster, while the floor is travertine imported from Italy. Custom screens were also imported from Italy, and the walk-in closets, called “vanity cabinets,” feature rare natural onyx stones that span a variety of colors. The rooms are designed to represent each of New York City’s five boroughs, according to the filing.

APL - Athletic Propulsion Labs

Photo courtesy of Schimenti Construction Co.

Project challenges included redesigning the roof support due to an existing terracotta structure, which required extending the completion schedule. The extreme curves and angles of the showroom also required a complex design that included a precise lighting installation under a stretch fabric cover. There were also unforeseen customs delays for crucial millwork.

The seven-month project was completed on budget and on time.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleThe CEO of ARTBA assesses the image of infrastructure policy after the elections
Next Article Merit Award, Higher Education/Research: Williams College, Davis Center
Machinery Asia
  • Website

Related Posts

Jamal Atkins: CIS leader for advancing multimodal infrastructure and mentoring the next generation

May 9, 2026

Gina Semerad: Health engineer Advancing design centered on the human being

May 9, 2026

Dhruv Patel: Leader of power and energy mentors emerging talent

May 9, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Jamal Atkins: CIS leader for advancing multimodal infrastructure and mentoring the next generation

Gina Semerad: Health engineer Advancing design centered on the human being

Dhruv Patel: Leader of power and energy mentors emerging talent

Pramodh Reddy: The design-build leader impacts California’s public sector projects

Popular Posts

Jamal Atkins: CIS leader for advancing multimodal infrastructure and mentoring the next generation

May 9, 2026

Gina Semerad: Health engineer Advancing design centered on the human being

May 9, 2026

Dhruv Patel: Leader of power and energy mentors emerging talent

May 9, 2026

Pramodh Reddy: The design-build leader impacts California’s public sector projects

May 9, 2026
Heavy Machinery

How to secure a car on a trailer safely step by step

April 30, 2026

Folding car trailer buying guide for small garage and easy storage

April 27, 2026

How does car trailer size affect towing capacity

April 17, 2026

Metal car trailer ramps make loading easier and safer

April 13, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.