Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Merit Award, Small Project: Athletic Propulsion Labs
Industry News

Merit Award, Small Project: Athletic Propulsion Labs

Machinery AsiaBy Machinery AsiaNovember 12, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

APL – Athletic Propulsion Labs

New York City

Merit Award


Sent by: Schimenti Construction Co.

Owner: app

Main design: Al-Jawad Pike

General contractor: Schimenti Construction Co.

Structural Engineer: Eipel Engineering Group

MEP Engineer: Custom design and engineering

Architect of record: Tricarico Architecture and Design PC




The performance footwear brand’s Manhattan flagship store is a 3,800-square-foot amphitheater-shaped store in SoHo, a second location after its Los Angeles headquarters, that is a testament to craftsmanship and creation meticulous, according to the project team.

The walls are custom handmade clay-based plaster, while the floor is travertine imported from Italy. Custom screens were also imported from Italy, and the walk-in closets, called “vanity cabinets,” feature rare natural onyx stones that span a variety of colors. The rooms are designed to represent each of New York City’s five boroughs, according to the filing.

APL - Athletic Propulsion Labs

Photo courtesy of Schimenti Construction Co.

Project challenges included redesigning the roof support due to an existing terracotta structure, which required extending the completion schedule. The extreme curves and angles of the showroom also required a complex design that included a precise lighting installation under a stretch fabric cover. There were also unforeseen customs delays for crucial millwork.

The seven-month project was completed on budget and on time.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleThe CEO of ARTBA assesses the image of infrastructure policy after the elections
Next Article Merit Award, Higher Education/Research: Williams College, Davis Center
Machinery Asia
  • Website

Related Posts

Hundreds dead when 7.5 magnitude earthquake collapses buildings in Venezuela

June 26, 2026

Technip-led team wins bid for $7.2m Mozambique floating LNG facility

June 26, 2026

US Department of Energy offers $17.5 million carrot to speed up new nuclear plants

June 25, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Hundreds dead when 7.5 magnitude earthquake collapses buildings in Venezuela

Technip-led team wins bid for $7.2m Mozambique floating LNG facility

US Department of Energy offers $17.5 million carrot to speed up new nuclear plants

Energy Department offers $17.5 million carrot to speed up nuclear plant components and projects

Popular Posts

Hundreds dead when 7.5 magnitude earthquake collapses buildings in Venezuela

June 26, 2026

Technip-led team wins bid for $7.2m Mozambique floating LNG facility

June 26, 2026

US Department of Energy offers $17.5 million carrot to speed up new nuclear plants

June 25, 2026

Energy Department offers $17.5 million carrot to speed up nuclear plant components and projects

June 25, 2026
Heavy Machinery

What to check before towing a car trailer in the summer

June 24, 2026

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.