Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Turner tops California’s $345 million mixed-use project
Industry News

Turner tops California’s $345 million mixed-use project

Machinery AsiaBy Machinery AsiaDecember 12, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

Turner Construction has completed 222 North Citya 460-unit mixed-use development that will also include more than 20,000 square feet of retail space in San Marcos, California, north of San Diego.

Developed by Sea Breeze Properties and designed by Safdie Rabines Architects, both based in San Diego, the structure is part of the 200-acre, $2 billion. Development of the northern city. North City is slated to include a total of 3,400 residential units, 1.1 million square feet of office space and 345,000 square feet of retail space. according to the project’s website.

In contrast to the broader urban sprawl of Southern California, North City aims to create a walkable community that combines living, shopping, art and culture, according to a statement from New York City-based Turner.

“This project is a catalyst for community-centered urban living,” Taal Safdie, principal of Safdie Rabines Architects, said in the statement. “It integrates green spaces with dynamic commercial opportunities to create a vibrant hub of connection.”

From its upper floors, 222 North City will include sweeping views of the San Marcos Mountains to the east, as well as the Pacific Ocean approximately 10 miles to the west.

The $345 million property will also include 440 underground parking spaces, according to San Diego-based Stevens. crest Engineers, which helped secure development permission for the site and provides planning, engineering and site surveying support.

Building amenities include:

  • A deck with trellised gardens.
  • swimming pools
  • Exterior cabins.
  • A gym.
  • A yoga room.
  • Creative office spaces.
  • Easy walk to dining, shopping and entertainment options.

Turner expects the project to be complete by the end of 2025.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleSCOTUS weighs fraud claim involving racial preferences
Next Article Bring renewable energy projects to the finish line!
Machinery Asia
  • Website

Related Posts

Critical Path | Engineering News-Register

March 5, 2026

U.S. Department of Labor sees repeal of Biden-era independent contractor classification

March 5, 2026

Construction views to the east | Engineering News-Register

March 5, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

What most buyers get wrong before transporting their first vehicle

Tandem axle aluminum utility trailer

Critical Path | Engineering News-Register

U.S. Department of Labor sees repeal of Biden-era independent contractor classification

Popular Posts

What most buyers get wrong before transporting their first vehicle

March 5, 2026

Tandem axle aluminum utility trailer

March 5, 2026

Critical Path | Engineering News-Register

March 5, 2026

U.S. Department of Labor sees repeal of Biden-era independent contractor classification

March 5, 2026
Heavy Machinery

What most buyers get wrong before transporting their first vehicle

March 5, 2026

Tandem axle aluminum utility trailer

March 5, 2026

Average width of a car trailer

March 4, 2026

Buying guide for open aluminum trailers for long-distance vehicle transport

March 3, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.