Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Award of Merit – Interior/tenant improvement: Leica Camera
Industry News

Award of Merit – Interior/tenant improvement: Leica Camera

Machinery AsiaBy Machinery AsiaDecember 17, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

LEICA CAMERA

Seattle

Merit Award


Sent by: Build group

OWNER: Leica camera

LEADING DESIGN COMPANY: MG2

GENERAL CONTRACTOR: Build group

STRUCTURAL ENGINEERING: Wow!

MEP ENGINEERING: Hargis




The scope of work for this build of a high-end camera store within a luxury shopping development included high-end millwork, finishes and display cases, a customer service lounge and areas back of house employees, all completed in three months.

The original design for the project called for crews to remove the thin tile and place polished concrete for the finished floor. But the demolition uncovered an existing 1.5-in. mortar bed below the tile which would have created an oversized step at the entrance threshold. To solve the problem, the project team chose a microtopping paving system, ideal for situations that require a thin concrete infill with a decorative finish.

Installing a tinted mirror in the store also required extensive planning and coordination. The mirror is 1/8 inch adjusted. reveals, with a horizontal reveal running across the top of a hidden door opening, a window opening and a display case. But given the mirror’s 8-10 week lead time and the project’s fast schedule, the contractor couldn’t wait until the field-scale wall was built. Working closely with the framing subcontractor, the team coordinated three different openings, all with different installation tolerances to ensure precise installation.

Working within such a small space required impeccable coordination between the trades, as many contractors were often working in the same space simultaneously. As crews were sheeting the hardtop roof, the glass subcontractor was installing mirror trim in the rough openings.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleHow Hydraulics Revolutionized the Construction Industry
Next Article Best Interior/Tenant Improvement: Washington Village
Machinery Asia
  • Website

Related Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Amtrak updates $6 million Baltimore tunnel project

Trump unveils plans for $22.5 million Dulles airport overhaul

Turner’s cost benchmark rose 5.2% in the second quarter

Inspector dead, four workers injured in Kansas interstate construction zone crash

Popular Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026

Inspector dead, four workers injured in Kansas interstate construction zone crash

July 30, 2026
Heavy Machinery

What size car trailer load winch do you need?

July 29, 2026

How to choose a manual winch for your car trailer loading needs

July 27, 2026

How to choose heavy-duty car tow ramps for safe loading

July 27, 2026

What width car trailer do you need for your vehicle?

July 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.