Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Of the archives: February 6, 1941
Industry News

Of the archives: February 6, 1941

Machinery AsiaBy Machinery AsiaMay 8, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

ENR 150th birthday

This 1941 cover image shows the workers at the top of the battery doors of the Grand Coulee dam in the mile in the state of Washington.

During the 1920’s, there was a bitter debate as to whether a “low -feet low” was built in height, which would generate electricity without supplying irrigation, or a “high” height of a height of 550 feet that would provide enough electricity to pump water in the Columbia basin for irrigation.

In 1933, the United States Claim Office and a consortium of three companies called MWAK (Mason-Walsh-Atkinson Kier Co.) began to build a high dam, although they had only received approval for a low dam.

Finally, in 1934, with the construction, President Franklin D. Roosevelt visited the site and approved the design of High Dam. This caused the Claim Office to decide to add the six companies, the successful group that had recently built Hoover Dam, to the Consortium Contracting, as the project had become larger.

Manufactured and installed by American Bridge Co., the 11 drum doors, each of 135 feet x 28 feet, provide a 1,485 feet long to be a movable spill crest.

When they are completely reduced, they have an exit capacity of 1 million feet per second, and when it is collected, it can increase the capacity of the deposit of 2.4 million feet, or 32%.

Completed in 1942, the electrical generation capacity of the 6,809 MW dam makes it the main electric power station of any kind.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous Article“Safety belongs to everyone”: the most valued by construction leaders
Next Article Rates trigger breaks in some detailed industrial real estate offers
Machinery Asia
  • Website

Related Posts

Meta commits to $115 million in construction labor pipeline for AI data centers

June 10, 2026

Construction views to the east | Engineering News-Register

June 9, 2026

Federal judge blocks Trump’s $100,000 fee for new H-1B visas

June 9, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Meta commits to $115 million in construction labor pipeline for AI data centers

Construction views to the east | Engineering News-Register

Federal judge blocks Trump’s $100,000 fee for new H-1B visas

Penn Station renderings reveal design for $8 million reconstruction beneath Madison Square Garden

Popular Posts

Meta commits to $115 million in construction labor pipeline for AI data centers

June 10, 2026

Construction views to the east | Engineering News-Register

June 9, 2026

Federal judge blocks Trump’s $100,000 fee for new H-1B visas

June 9, 2026

Penn Station renderings reveal design for $8 million reconstruction beneath Madison Square Garden

June 9, 2026
Heavy Machinery

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

As a double-axle tilting trailer facilitates the transport of vehicles and equipment

June 5, 2026

TYPHON Machinery Launches New xFlex Scissor Lift Series Designed for Safer and Smarter Modern Worksites

June 1, 2026

What are the most durable materials used in the construction of car trailers

May 13, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.