Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » Best Fabrication: Fineline Steel Fabrication
Industry News

Best Fabrication: Fineline Steel Fabrication

Machinery AsiaBy Machinery AsiaNovember 22, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Fineline steel fabrication


Centerville, Utah


BEST PROJECT


Presented by Hogan & Associates Construction


owner Fineline steel fabrication


Leading design company Frank N. Murdock Jr. and associates


General Contractor Hogan & Associates Construction


Road engineer Reference engineering


Structural Engineer Calder Richards Structural Consulting Engineers




Wrapped in a bright red stripe, Fineline’s new 900-foot-long, 113,000-square-foot structure houses the manufacturer’s automated steel fabrication line. Situated on 9 acres, the facility offers its employees a better workplace and raises industry standards. Part of what dictated the length of the building was the robotic machinery to be housed inside, which also affected the design and location of the site. However, the new facility is also within meters of Fineline’s former buildings, so the requirements for occupied space and robotic machinery made the placement of the building critical. The team carefully navigated these spaces so steel production could continue during construction of the new facility.

Also, due to the robotic machinery requirements, the space does not have many interior walls, which created challenges for the trades working in the same space.

Due to the building’s unique requirements, the team timed the placement of each component as closely as possible to finish the floor, steelwork and envelope almost in tandem.

Fineline steel fabrication

Photo courtesy of Kyle Aiken Photography

Material delays presented a challenge early on, and halfway through the project, the team changed the roof structure from joist and deck to I-beam. Since the steel fabrication shop has high energy demands, the team selected in-stock items to mitigate lead times and electrical gear delays while meeting the building’s energy requirements.

As part of the owner’s goal to improve the work environment for its employees, the facility will use a different cable that burns more efficiently, generating less smoke and without sulfur. The project team also installed air systems that constantly circulate and separate the welding air to ensure that smoke does not pass through the hoods.

This new facility will increase Fineline’s production sixfold, speeding up the steelmaking process. Meanwhile, as the market moves toward automation, Fineline is helping some welders and material handlers become engineers. Now they use robotics instead of welding or driving a forklift. It has also allowed Fineline to lower operating costs, add jobs to the community and increase its workforce by 63%.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleJudges select the winners of the best Colorado/Wyoming and Intermountain 2025 projects
Next Article Award of Merit, Interior/Tenant Improvement: Tru Fru
Machinery Asia
  • Website

Related Posts

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026

Flintco-Mortenson JV begins concrete deck on Oklahoma City’s $900 million NBA stadium

October 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

Kingsport Times News | Local news, weather and sports

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

Blattner is a contractor for the $750 million wind power project in South Dakota

Popular Posts

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

October 17, 2026

Kingsport Times News | Local news, weather and sports

October 17, 2026

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026
Heavy Machinery

How to choose the right car trailer for your vehicle?

October 15, 2026

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.