Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » Howard Russell collapsed owing suppliers £4.6m
Industry News

Howard Russell collapsed owing suppliers £4.6m

Machinery AsiaBy Machinery AsiaJune 28, 2023No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Newcastle-based Howard Russell Construction owed suppliers and trade subcontractors almost £4.6m when it collapsed last month.

The company, which mainly built industrial warehouses and manufacturing facilities, went into administration at the beginning of May.

A report by administrators FRP Advisory has revealed it owed £4.58m to unsecured trade creditors, including M&C Roofing Contractors, also based in Newcastle, which is claiming £759,000.

In total, 208 creditors were listed in the report, with debts totaling just over £9m.

FRP Advisory said it thought there will be enough funds to make a distribution to unsecured creditors, although the amount will not be known until after the company is liquidated.

In the year to March 2022, Howard Russell made a pre-tax profit of £790,000 on turnover of £43.6m and expected to post revenues of between £60m and £70m l next year

However, according to the administrators’ report, the profitability of their contracts was greatly affected by the impact of Covid, Brexit and increased material costs.

There were also “significant delays” in some construction contracts, which subsequently incurred large penalties that greatly affected the profitability of those contracts, the report said.

In addition, Howard Russell was hit by defects liability claims and claims against claims made on larger completed contracts which dealt a major blow to the company’s solvency.

“The principals tried to implement various change strategies; however, all attempts were unsuccessful,” the report concludes.

The company is one of a number of North East contractors to go under so far this year, with Tolent, Metnor and Norstead ceasing to trade.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleClimate change: Ministers told to take ‘fast action’ on new energy infrastructure
Next Article Bam to launch £210m Huddersfield regeneration project
Machinery Asia
  • Website

Related Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Amtrak updates $6 million Baltimore tunnel project

Trump unveils plans for $22.5 million Dulles airport overhaul

Turner’s cost benchmark rose 5.2% in the second quarter

Inspector dead, four workers injured in Kansas interstate construction zone crash

Popular Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026

Inspector dead, four workers injured in Kansas interstate construction zone crash

July 30, 2026
Heavy Machinery

What size car trailer load winch do you need?

July 29, 2026

How to choose a manual winch for your car trailer loading needs

July 27, 2026

How to choose heavy-duty car tow ramps for safe loading

July 27, 2026

What width car trailer do you need for your vehicle?

July 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.