Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » Helsinki’s iconic bridge celebrates sustainable mobility
Industry News

Helsinki’s iconic bridge celebrates sustainable mobility

Machinery AsiaBy Machinery AsiaMay 21, 2026No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

The city of Helsinki, Finland, has added another milestone to its array of architectural attractions with the recent opening of the Kruunuvuorensilta, the country’s longest and tallest bridge.

Part of the Crown Bridges Light Rail project, a three-bridge, $378 million program to link Helsinki’s city center with the fast-growing Laajasalo district, the 1,200-meter-long cable-stayed structure with its 135-meter (443-foot) high diamond-shaped pylon is designed exclusively for public transport and cyclists. Recent studies indicate that private vehicles account for only 18% of all trips in the city. A vertical main channel clearance of 20m will preserve passage for most sailing vessels.

Due to be completed in early 2027, the Kruunuvuorensilta tram line will be part of a 10 kilometer system connecting central Helsinki with Laajasalo, which is expected to double in population over the next two decades.

The construction of the $142 million Kruunuvuorensilta, designed by the UK-based team of Knight Architects and WSP Finland, was carried out by the joint venture of Finnish construction companies YIT and Kreate Oy. The four-year effort, which included the two-year concrete casting of the pylon, was itself a model of sustainability, with the use of low-emission materials and renewable energy sources. The total carbon footprint is approximately 129,000 tonnes of carbon dioxide equivalent, of which 76% comes from construction and 24% from operation and maintenance over a 50-year period. Helsinki is working towards a city-wide goal of net zero carbon by 2040 and carbon negative thereafter.

“Bridges of this size are rarely built exclusively for public transportation, pedestrians and cyclists,” Knight Architects stated in a press release.

Creating a distinctive bridge with a design life of 200 years proved equally challenging, given the demanding landscape and coastal location of Helsinki which results in exposure to a wide range of weather conditions. The tin cables of the structure are designed to stay in a constant slight movement in the wind, helping to prevent ice formation. Ice build-up is further reduced by enclosing the cables in textured plastic sheaths that break the ice into fine particles. Other features include a wind warning system, with high wind alerts displayed on light boards at both ends.

Other features include a generous and clearly organized deck that offers wide, legible routes that allow for intuitive movement for pedestrians and cyclists; a curved alignment that allows users to see their destination ahead, reducing the “vanishing point” often found on straight bridges; and a “family” of three parapets that maintain a high-quality and consistent pedestrian experience, protect from prevailing winds and maintain views.

The Crown Bridges programme, which began construction in 2021, has also included improvements to streets and public services along the route, including the replacement of an existing vehicular crossing in Helsinki city center to remove ramps and improve accessibility for pedestrians and cyclists.

Looking for quick answers on construction and engineering topics?
Try Ask ENR, our new intelligent AI search tool.

Ask ENR →

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleLight rail project mediation settles $50 million payment to Walsh
Machinery Asia
  • Website

Related Posts

Light rail project mediation settles $50 million payment to Walsh

May 21, 2026

Can a single data system look at all contractor risks?

May 21, 2026

ZGF turned to Bluebeam Studio to complete the work at Portland Airport

May 21, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Helsinki’s iconic bridge celebrates sustainable mobility

Light rail project mediation settles $50 million payment to Walsh

Can a single data system look at all contractor risks?

ZGF turned to Bluebeam Studio to complete the work at Portland Airport

Popular Posts

Helsinki’s iconic bridge celebrates sustainable mobility

May 21, 2026

Light rail project mediation settles $50 million payment to Walsh

May 21, 2026

Can a single data system look at all contractor risks?

May 21, 2026

ZGF turned to Bluebeam Studio to complete the work at Portland Airport

May 21, 2026
Heavy Machinery

What are the most durable materials used in the construction of car trailers

May 13, 2026

Which open vs enclosed car trailer makes sense for you

May 13, 2026

How to secure a car on a trailer safely step by step

April 30, 2026

Folding car trailer buying guide for small garage and easy storage

April 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.