Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป ENR West June 2026 Snapshot: I-405/Brickyard to SR 527 Improvement Project
Industry News

ENR West June 2026 Snapshot: I-405/Brickyard to SR 527 Improvement Project

Machinery AsiaBy Machinery AsiaJune 16, 2026No Comments1 Min Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

When complete, the I-405/Brickyard at SR 527 improvement project will improve four and a half miles of the corridor, primarily in Bothell, Washington, north of Bellevue.

The $834 million project is a collaboration between WSDOT, Sound Transit and design-build contractor Skanska USA Inc.

Josh Barrios, Skanska’s senior director of environment, health and safety, captured part of the demolition earlier this year on his iPhone 16.

Several overpass ramps, loop ramps and bridges are to be removed at the I-405/SR 522 interchange to allow for the construction of two new bridges.

As a security officer, Barrios is often on site for these operations. “As someone who is in and around the workplace on a daily basis, capturing a moment like this brings great pride and excitement for the work to come,” he says.

The project is expected to complete construction in 2028.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleThe latest construction data indicated activity outside the data center boom
Next Article Why the incorporation of private capital of construction companies increases the risk of the project
Machinery Asia
  • Website

Related Posts

Hawaii’s AEC market is making a big splash

June 16, 2026

Why the incorporation of private capital of construction companies increases the risk of the project

June 16, 2026

The latest construction data indicated activity outside the data center boom

June 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Hawaii’s AEC market is making a big splash

Why the incorporation of private capital of construction companies increases the risk of the project

ENR West June 2026 Snapshot: I-405/Brickyard to SR 527 Improvement Project

The latest construction data indicated activity outside the data center boom

Popular Posts

Hawaii’s AEC market is making a big splash

June 16, 2026

Why the incorporation of private capital of construction companies increases the risk of the project

June 16, 2026

ENR West June 2026 Snapshot: I-405/Brickyard to SR 527 Improvement Project

June 16, 2026

The latest construction data indicated activity outside the data center boom

June 16, 2026
Heavy Machinery

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

As a double-axle tilting trailer facilitates the transport of vehicles and equipment

June 5, 2026

TYPHON Machinery Launches New xFlex Scissor Lift Series Designed for Safer and Smarter Modern Worksites

June 1, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.