Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป JV lands $437 million California light rail extension contract
Industry News

JV lands $437 million California light rail extension contract

Machinery AsiaBy Machinery AsiaMarch 13, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

Award: East San Jose Light Rail Extension
Value: $437 million contract, $653 million for the overall project
Location: San Jose, California
Customer: Santa Clara Valley Transport Authority

In the works for two decades, the East San Jose Light Rail Extension aims to reduce traffic congestion and expand transit access to the densely populated eastern part of the city. With a major construction award, this project is a big step closer to reality.

The Santa Clara Valley Transportation Authority selected Sacramento, Calif.-based MCM Construction and New York City-based RailWorks Corp. to build the Eastern Light Rail Extension Project San Jose. Thursday the board of directors of VTA unanimously voted to award the contractworth $437 million, in the joint venture.

The widening is the final phase of the larger Capitol Expressway transit improvement project, which aims to transform the Capitol Expressway through the city into a multimodal route with bus and rail rapid transit light, according to the VTA.

The project involves extending light rail service from the Alum Rock Transit Center 2.4 miles to the Eastridge Transit Center, allowing VTA riders to connect directly to the Bay Rapid Transit System Area at the Milpitas station. It also includes an elevated guideway above the Capitol Expressway corridor and new stations at Story Road and Eastridge Transit Center.

The joint offer of $437 million from the JV came around $122 million above VTA estimates, according to the San Jose Spotlight, in large part due to differing estimates of potential inflation in building materials. The VTA board gave the go-ahead Thursday for the agency to cover most of the additional cost.

The overall project is now estimated to cost $653 million. This sum includes pedestrian and bus improvements in the area, as well as utility relocation and land acquisition work that has already been completed.

However, MCM Construction and RailWorks Corp. he pledged to cut a year off the project schedule. Work is expected to begin in April and be completed in 2028.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBechtel to invest $7 million for suicide prevention in construction
Next Article Texas planned a high-speed train that was slowly moving forward, despite previous problems
Machinery Asia
  • Website

Related Posts

Canada to Wyoming Pipeline Gets Presidential Permit to Go Ahead

May 1, 2026

Bridger Pipeline Expansion Gets Presidential Permit for Canada-Wyoming Crude Line

May 1, 2026

Lessons from the debate over Maine’s data center moratorium on construction

May 1, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Canada to Wyoming Pipeline Gets Presidential Permit to Go Ahead

Bridger Pipeline Expansion Gets Presidential Permit for Canada-Wyoming Crude Line

Lessons from the debate over Maine’s data center moratorium on construction

Construction views to the east | Engineering News-Register

Popular Posts

Canada to Wyoming Pipeline Gets Presidential Permit to Go Ahead

May 1, 2026

Bridger Pipeline Expansion Gets Presidential Permit for Canada-Wyoming Crude Line

May 1, 2026

Lessons from the debate over Maine’s data center moratorium on construction

May 1, 2026

Construction views to the east | Engineering News-Register

May 1, 2026
Heavy Machinery

How to secure a car on a trailer safely step by step

April 30, 2026

Folding car trailer buying guide for small garage and easy storage

April 27, 2026

How does car trailer size affect towing capacity

April 17, 2026

Metal car trailer ramps make loading easier and safer

April 13, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.