Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » AOM K-12 Education: Washington Latin Public Charter School Cooper Campus
Industry News

AOM K-12 Education: Washington Latin Public Charter School Cooper Campus

Machinery AsiaBy Machinery AsiaOctober 7, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Washington Latin Public School Cooper Campus

Washington, D.C

Merit Award

Owner: Washington Latin Public School

Main design company: Studio Twenty Seven Architecture

General contractor: MCN Build

Subcontractors: Freestate Electric; Iron manufacturing services; Atlas Foundations; Cornerstone Mechanical Solutions; Justin Co.; LP ceilings; Ranger Specialty Glass; Bayside Fire Protection; Beechfield Landscaping; Alcoa concrete and masonry of DC

The project combined the construction of a new academic building with the renovation and modernization of the former Kirov Academy of Ballet, a historic neoclassical brick building that now houses Washington Latin’s Upper School program, along with administrative offices, a library, athletic facilities and performing arts spaces. The renovation balanced historic preservation with the needs of a modern educational institution, incorporating accessibility improvements and updated infrastructure. The new building, which houses the high school, combines academic spaces with gathering areas and outdoor facilities such as rooftop terraces and a basketball court that combine to provide a unique environment for recreation, community and learning.

Accomplishing distinct and distinctive construction scopes required careful sequencing of work, shared logistical planning, and continuous communication between project teams to minimize disruption to the campus and surrounding neighborhood. MCN Build worked closely with school leadership to develop a phased rotation plan to ensure the campus was ready for students on the first day of the new term.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest K-12 Education: Washington International School Tregaron Science Building (“Le Center Brown”)
Next Article Best Manufacturing: CloudHQ LC3 Data Center
Machinery Asia
  • Website

Related Posts

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026

Flintco-Mortenson JV begins concrete deck on Oklahoma City’s $900 million NBA stadium

October 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

Kingsport Times News | Local news, weather and sports

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

Blattner is a contractor for the $750 million wind power project in South Dakota

Popular Posts

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

October 17, 2026

Kingsport Times News | Local news, weather and sports

October 17, 2026

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026
Heavy Machinery

How to choose the right car trailer for your vehicle?

October 15, 2026

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.