Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » Award of Merit, Cultural/Worship: Deseret Peak Utah Temple
Industry News

Award of Merit, Cultural/Worship: Deseret Peak Utah Temple

Machinery AsiaBy Machinery AsiaNovember 22, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Deseret Peak Utah Temple


Tooele, Utah


Merit Award


Presented by Oakland construction


owner Department of Special Projects, Church of Jesus Christ of Latter-day Saints


Leading design company Architects FFKR


General Contractor Oakland construction


Road engineer CRS Engineers (Horrocks)


Structural Engineer ARW engineers


MEP engineer Health Engineering


Subcontractors Taylor Electric; Palmer Christiansen




The exterior of this three-story, 72,000-square-foot steel and concrete structure is clad in a precast stone product made from a dolomite aggregate, while the windows feature locally designed and manufactured art glass. The interiors include extensive carved stone and millwork as well as decorative painting.

Located on a 15.5-acre site, the temple’s scope of work also included a 20,000-square-meter meeting house and a 1,200-square-meter maintenance building. Although the project officially began in May 2021, permit issues prevented construction from starting until the end of August.

Shortly after construction began, the design team added a revised folding floor mitigation plan, which called for a membrane system under the entire building footprint that would collect any migrating or unwanted moisture that entered the subsoil. This delayed the underground and slab-to-grade efforts.

To mitigate these impacts, the team placed concrete for the upper floors of the temple before the flush slab. Towards the end of construction, a last-minute schedule change required a complete renovation of an already completed section of the building.

Despite these challenges, the team delivered the temple a month ahead of schedule.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest Airport/Transit: Delta Air Lines Flight Operations Center
Next Article Best Energy/Industrial: Hornshadow Solar | Engineering News-Register
Machinery Asia
  • Website

Related Posts

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026

Flintco-Mortenson JV begins concrete deck on Oklahoma City’s $900 million NBA stadium

October 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

Kingsport Times News | Local news, weather and sports

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

Blattner is a contractor for the $750 million wind power project in South Dakota

Popular Posts

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

October 17, 2026

Kingsport Times News | Local news, weather and sports

October 17, 2026

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026
Heavy Machinery

How to choose the right car trailer for your vehicle?

October 15, 2026

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.