Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » Award of Merit — Energy/Industrial: Tampa Electric Company South Tampa Resiliency
Industry News

Award of Merit — Energy/Industrial: Tampa Electric Company South Tampa Resiliency

Machinery AsiaBy Machinery AsiaOctober 14, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Tampa Electric Company South Tampa Resiliency

cover up

Merit Award

Sent by: Construction Sundt

Owner: Tampa Electric Co.

Main design company: Sargent and Lundy

General contractor: Construction Sundt

Civil contractor: Moretrench Industrial

Four Wärtsilä reciprocating engines producing a combined 72 MW now form a microgrid for south Tampa that will keep the power going. The plant occupies less than 2 hectares on an Air Force base, where the footprint made cross-discipline sequencing a daily challenge. But after two back-to-back hurricanes hit Tampa in 2024, storm surge put parts of MacDill Air Force Base under 4 feet of salt water, including the project’s rest area. Equipment skids damaged by salt water for two of the four engine units. The team reconfigured the schedule around the contractor’s on-site manufacturing capabilities, manufacturing and replacing components in-house to mitigate delays.

The work was sequenced to allow the disciplines ample time and space to work on a daily basis. Navisworks federated models carried the process piping and steel structure along with OEM equipment, electrical conduit and cable tray, helping with clearances while digital workstations allow teams to access models and drawings in situ. The engine foundations were placed 1/16-in. tolerance between motherboards, which requires significant advance planning. Crews also pulled and completed about 250,000 linear feet of cable without an output failure.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleThe dredging campaign for the capital city of Dublin Port is nearing the end of Magnor
Next Article Best Project: Higher Education/Research: North Carolina State University Power Distribution Upgrade
Machinery Asia
  • Website

Related Posts

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026

Flintco-Mortenson JV begins concrete deck on Oklahoma City’s $900 million NBA stadium

October 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

Kingsport Times News | Local news, weather and sports

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

Blattner is a contractor for the $750 million wind power project in South Dakota

Popular Posts

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

October 17, 2026

Kingsport Times News | Local news, weather and sports

October 17, 2026

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026
Heavy Machinery

How to choose the right car trailer for your vehicle?

October 15, 2026

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.