Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home ยป Award of Merit, Higher Education/Research: University of Vermont Athletic Campus Multipurpose Center
Industry News

Award of Merit, Higher Education/Research: University of Vermont Athletic Campus Multipurpose Center

Machinery AsiaBy Machinery AsiaNovember 20, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

University of Vermont Athletic Campus Multipurpose Center


Burlington, Vt.


Merit Award


Presented by PC construction


Owner: University of Vermont


Main design company: TruexCullins Architecture


Construction Manager: PC construction


Civil Engineer: Krebs & Lansing Consulting Engineers


Structural Engineer: Engineering projects


MEP Engineer: O’Brien Halls


Mechanical design assistance: VHV Co.


Electrical design assistance: Benoit Electric




After a pandemic-related work stoppage that also forced a 25 percent reduction in the project’s scope, the team relaunched the upgrade with a sequenced modification installing detailed and intricate steel reinforcements to the hockey arena’s barrel roof and adding a new media loft.

While choreographing the demolition of the wall and moving materials and equipment in and out of the building, the team maintained the ice rink’s precise temperature and humidity specifications.

Other renovations included a full-size multipurpose sports rink, renovated men’s and women’s hockey locker rooms, strength and conditioning facilities, offices, an academic space for student-athletes and a new hospitality room for team fans.

All work was scheduled around games and other team activities.

The foundations of a deferred multi-purpose field were completed and covered with high-density rigid insulation and gravel to protect against Vermont winters.

When it’s time to build, the insulation can be removed and key connection points easily located without causing damage.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleAward of Merit, Airport/Transit: South Coast Rail
Next Article Best Interior/Tenant Improvement: Club 200
Machinery Asia
  • Website

Related Posts

The $900 million final defense bill passes the House with sweeping acquisition and infrastructure changes

December 12, 2025

Judge rejects bid to halt Hudson Tunnel procurement

December 12, 2025

As demand grows, Swinerton taps into a new solid wood lead

December 11, 2025
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

The $900 million final defense bill passes the House with sweeping acquisition and infrastructure changes

Judge rejects bid to halt Hudson Tunnel procurement

As demand grows, Swinerton taps into a new solid wood lead

Robotics startup Buildroid AI to bring automated model-based palletizing to US workplaces

Popular Posts

The $900 million final defense bill passes the House with sweeping acquisition and infrastructure changes

December 12, 2025

Judge rejects bid to halt Hudson Tunnel procurement

December 12, 2025

As demand grows, Swinerton taps into a new solid wood lead

December 11, 2025

Robotics startup Buildroid AI to bring automated model-based palletizing to US workplaces

December 11, 2025
Heavy Machinery

Aluminum car trailer

December 2, 2025

Wheel Dozer vs. Crawler Dozer

November 20, 2025

Where can I find reliable mini excavator dealers near me?

October 27, 2025

The complete expert guide to faster and smarter cargo transportation

October 27, 2025

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.