Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » Award of Merit, Higher Education/Research: University of Vermont Athletic Campus Multipurpose Center
Industry News

Award of Merit, Higher Education/Research: University of Vermont Athletic Campus Multipurpose Center

Machinery AsiaBy Machinery AsiaNovember 20, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

University of Vermont Athletic Campus Multipurpose Center


Burlington, Vt.


Merit Award


Presented by PC construction


Owner: University of Vermont


Main design company: TruexCullins Architecture


Construction Manager: PC construction


Civil Engineer: Krebs & Lansing Consulting Engineers


Structural Engineer: Engineering projects


MEP Engineer: O’Brien Halls


Mechanical design assistance: VHV Co.


Electrical design assistance: Benoit Electric




After a pandemic-related work stoppage that also forced a 25 percent reduction in the project’s scope, the team relaunched the upgrade with a sequenced modification installing detailed and intricate steel reinforcements to the hockey arena’s barrel roof and adding a new media loft.

While choreographing the demolition of the wall and moving materials and equipment in and out of the building, the team maintained the ice rink’s precise temperature and humidity specifications.

Other renovations included a full-size multipurpose sports rink, renovated men’s and women’s hockey locker rooms, strength and conditioning facilities, offices, an academic space for student-athletes and a new hospitality room for team fans.

All work was scheduled around games and other team activities.

The foundations of a deferred multi-purpose field were completed and covered with high-density rigid insulation and gravel to protect against Vermont winters.

When it’s time to build, the insulation can be removed and key connection points easily located without causing damage.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleAward of Merit, Airport/Transit: South Coast Rail
Next Article Best Interior/Tenant Improvement: Club 200
Machinery Asia
  • Website

Related Posts

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026

Flintco-Mortenson JV begins concrete deck on Oklahoma City’s $900 million NBA stadium

October 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

Kingsport Times News | Local news, weather and sports

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

Blattner is a contractor for the $750 million wind power project in South Dakota

Popular Posts

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

October 17, 2026

Kingsport Times News | Local news, weather and sports

October 17, 2026

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026
Heavy Machinery

How to choose the right car trailer for your vehicle?

October 15, 2026

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.