Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home ยป Award of Merit, Interior Improvement/Tenant: The Culver Studios (J&O Buildings)
Industry News

Award of Merit, Interior Improvement/Tenant: The Culver Studios (J&O Buildings)

Machinery AsiaBy Machinery AsiaOctober 16, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

The Culver Studios (J&O Buildings)

Culver City, California

Merit Award


Sent by: Swinerton Builders

Owner: Client confidential

Main design company: executioner

General contractor: Swinerton Builders

Structural Engineer: Structural approach

MEP Engineer: Hargis

Owner’s representative: JLL

AV/Acoustic Engineer: Arup


Subcontractors: ACCO; Electric Helix; Seeley Brothers; Martin brothers



Originally built in 1918, The Culver Studios lot that houses this confidential client’s new mixed-use campus played a key role in bringing such beloved hits as “Gone with the Wind” and “The Wizard of Oz”. The 14-acre campus was redesigned through this 216,634-square-foot tenant improvement project, which was completed on time and on budget in August 2023.

The work spans two four-story buildings, Buildings J and O. Building O includes a 100-person training room on the first floor and is home to the Thursday Night NFL broadcast room Football on the second floor. The first floor of the J Building, which is filled with specialist rooms, is a 28,600 square meter multi-functional space that features Dolby-certified recording studios and podcast rooms.

The campus was occupied and would remain open throughout the project. However, the client expected to start using new spaces as they became available. A multi-phase approach allowed occupancy as floors were completed.

Noise mitigation was also crucial and the team had to navigate within limited hours to work hard. Teams were closely coordinated to ensure no noise disruptions occurred.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest Project, Manufacturing: Goodman Logistics Center Fullerton
Next Article Haselden opens office in Montana | Immersion in construction
Machinery Asia
  • Website

Related Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Amtrak updates $6 million Baltimore tunnel project

Trump unveils plans for $22.5 million Dulles airport overhaul

Turner’s cost benchmark rose 5.2% in the second quarter

Inspector dead, four workers injured in Kansas interstate construction zone crash

Popular Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026

Inspector dead, four workers injured in Kansas interstate construction zone crash

July 30, 2026
Heavy Machinery

What size car trailer load winch do you need?

July 29, 2026

How to choose a manual winch for your car trailer loading needs

July 27, 2026

How to choose heavy-duty car tow ramps for safe loading

July 27, 2026

What width car trailer do you need for your vehicle?

July 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.