Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home ยป Award of Merit – Interior/Tenant Improvement: Bellevue Tech Office IT
Industry News

Award of Merit – Interior/Tenant Improvement: Bellevue Tech Office IT

Machinery AsiaBy Machinery AsiaDecember 18, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

BELLEVUE IT TECHNICAL OFFICE

Bellevue, Wash.

Merit Award


Sent by: Turner Construction Co.

OWNER: amazon.com

LEADING DESIGN COMPANY: Boulder Associates

GENERAL CONTRACTOR: Turner Construction Co.

CONSTRUCTION MANAGER: Seneca Group




With 13 floors of offices and six floors of services, this new 19-level office space spans a total of 500,000 square feet. The amenity floors include three furnished terrace spaces, a separate pet terrace, interconnected staircases, independent work spaces, training rooms and collaborative meeting spaces. .

Completed on time and on budget in September 2023, the project’s design takes into account the post-pandemic workplace and redefined office. The team chose a phased construction approach, with the first delivery of these 19 floors out of the tower’s 42 total.

A TAKT schedule, where construction activities follow a weekly jump to the next floor, allowed for a steady and consistent workflow. Completing work on one floor before moving on to the next also helped prepare workers for a successful start to each new week.

Electrical and mechanical designs were coordinated and verified prior to hanging the drywall with scheduled walk-ins and design. Strategies such as vacuuming only to reduce dust and debris, all equipment on wheels for mobility and safety, and just-in-time deliveries helped keep the site clean and tidy.

Extensive communication and coordination allowed the team to stay ahead of any design changes during site reviews. The Individual Distribution Frame (IDF) rooms required an additional level of scrutiny and timely delivery to ensure that all programming and security tasks could be completed before the customer moved in.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest Manufacturing, Safety Award of Merit: 25K ISO 4 Cleanroom Expansion
Next Article Best Office/Retail/Mixed Use: West Main | Engineering News-Register
Machinery Asia
  • Website

Related Posts

Businesses counteract the closure of Washington Bridge

June 12, 2025

Osha proposed cuts will not affect the application: mourning chief

June 12, 2025

Climate change will cost your health plan. Analysts want to know how much.

June 12, 2025
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Businesses counteract the closure of Washington Bridge

Osha proposed cuts will not affect the application: mourning chief

Climate change will cost your health plan. Analysts want to know how much.

Boeing Tapas Jacobs for $ 1.8 million from St. Louis Campus Expansion

Popular Posts

Businesses counteract the closure of Washington Bridge

June 12, 2025

Osha proposed cuts will not affect the application: mourning chief

June 12, 2025

Climate change will cost your health plan. Analysts want to know how much.

June 12, 2025

Boeing Tapas Jacobs for $ 1.8 million from St. Louis Campus Expansion

June 12, 2025
Heavy Machinery

Substitution ramp door for utility trailer

June 9, 2025

Inclined aluminum car transport trailer

June 9, 2025

Essential guide for storage and safety

June 4, 2025

Light force for everyday use

June 4, 2025

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.