Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home ยป Award of Merit, K-12 Education: Francis Parker School Phase 8 Athletic Complex
Industry News

Award of Merit, K-12 Education: Francis Parker School Phase 8 Athletic Complex

Machinery AsiaBy Machinery AsiaOctober 28, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Francis Parker School Phase 8 Athletic Complex


san diego


Merit Award


Presented by Level 10 build


owner Francis Parker School


Leading design company executioner


General Contractor Level 10 build


Civil Engineer Nasland


Structural Engineer Miyamoto International


MEP engineer Master Engineers


electrical engineer Akela Engineering


Works manager O’Connor Construction Management




Perched atop a post-tensioned concrete parking structure, this $34 million, 48,770-square-foot sports complex includes a full-size basketball court, locker rooms, support spaces for the neighboring aquatics center, classrooms and administrative spaces.

Since the project is located between the school’s main campus and an existing field house, the team had to guide student movement through the active workplace using a temporary, elevated pedestrian walkway that allowed students to safely move from one area to another.

Ensuring correct soil accumulation was essential for the new space to fit the exterior elevations and align with the existing weight constraints of the post-tensioned slab. But the structure was not square and the intended connection points did not align with the new layout of the building.

Thus, the team performed detailed mapping and scanning to identify PT tendons for all connection points and pipe penetrations through the slabs to ensure proper alignment.

Completion of the design of a feature stone retaining wall was delayed and required material from an Italian quarry. The project team coordinated with the supplier to ensure that the materials arrived before the end of the project in September 2024.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleWhat’s The REAL Power Behind Your Skid Steer Loader Tracked 22.1 HP Honda EPA Gasoline Engine?
Next Article Electro Miniature Series: Boss RC505 mk2 #3 – by Eddy Sonik
Machinery Asia
  • Website

Related Posts

Holtec advances construction of small palisade reactors, shelf IPO planned

September 18, 2026

Bechtel separates from Bill Gates-backed nuclear project, files layoff notice

September 18, 2026

Mesa approves $3 million legacy park under strict desert water rules

September 18, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

JCB India launches 10 new machines at Bauma CONEXPO INDIA 2026

Single Axle Tilt Trailer: What you need to know before you buy?

Tipper trailer: what to check before buying?

Westland uses a backhoe to remove the Flock cameras

Popular Posts

JCB India launches 10 new machines at Bauma CONEXPO INDIA 2026

September 20, 2026

Single Axle Tilt Trailer: What you need to know before you buy?

September 20, 2026

Tipper trailer: what to check before buying?

September 20, 2026

Westland uses a backhoe to remove the Flock cameras

September 20, 2026
Heavy Machinery

Single Axle Tilt Trailer: What you need to know before you buy?

September 20, 2026

Tipper trailer: what to check before buying?

September 20, 2026

How to choose the right farm trailer

September 10, 2026

How do you build a generator trailer for heavy rear loads?

September 7, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.