Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Award of Merit, K-12 Education: Salt Lake City School District Administration Building
Industry News

Award of Merit, K-12 Education: Salt Lake City School District Administration Building

Machinery AsiaBy Machinery AsiaNovember 23, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Salt Lake City School District Administration Building


Salt Lake City


Merit Award


Presented by Big-D construction


owner Salt Lake City School District


Leading design company NJRA Architects


General Contractor Big-D construction


Road engineer Meridian Engineering


Structural Engineer Calder Richards


MEP engineers BNA Consulting; Olsen & Peterson Consulting Engineers




To achieve a modern headquarters that would serve the school district for decades, this project features a two-story, 60,000-square-foot administrative office building for most of the school district’s functional departments, as well as a 220-space parking garage.

The steel frame structure incorporates concrete shear walls and is clad with masonry veneer, metal panel walls and curtain wall glazing systems. Inside, features include conference rooms, work rooms, break rooms, open office areas, private offices, testing rooms, equipment rooms and classrooms.

The team originally planned to build the entire building floor by floor, but had to resequence to account for weather delays. The building has an L-shaped structure with three main sections: two wings and a central area, so the steel workers built the two floors of one section, then the concrete workers and shipbuilders would work in that section while the steel workers moved on to the next section.

This plan allowed the team to make up for lost time and helped achieve an on-time delivery in September 2024.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleAward of Merit, Higher Education/Research: Tooele Technical College Expansion and Renovation
Next Article Best Small Project: Weber State University “W”
Machinery Asia
  • Website

Related Posts

May 2026 City Scoop: Atlantic City

May 20, 2026

Maryland Revises Key Bridge Reconstruction Strategy

May 20, 2026

The life sciences construction boom is giving way to a more selective market

May 19, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

May 2026 City Scoop: Atlantic City

Maryland Revises Key Bridge Reconstruction Strategy

The life sciences construction boom is giving way to a more selective market

People of the East: May 2026 Updates

Popular Posts

May 2026 City Scoop: Atlantic City

May 20, 2026

Maryland Revises Key Bridge Reconstruction Strategy

May 20, 2026

The life sciences construction boom is giving way to a more selective market

May 19, 2026

People of the East: May 2026 Updates

May 19, 2026
Heavy Machinery

What are the most durable materials used in the construction of car trailers

May 13, 2026

Which open vs enclosed car trailer makes sense for you

May 13, 2026

How to secure a car on a trailer safely step by step

April 30, 2026

Folding car trailer buying guide for small garage and easy storage

April 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.