Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Award of Merit, Renovation/Restoration: UTA On-Call Transit Infrastructure
Industry News

Award of Merit, Renovation/Restoration: UTA On-Call Transit Infrastructure

Machinery AsiaBy Machinery AsiaNovember 23, 2025No Comments1 Min Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

UTA on-call traffic infrastructure


Salt Lake City


Merit Award


Presented by Stacy and Witbeck


owner Utah Transit Authority


Leading design company Sener (S-Curve task order only)


General Contractor Stacy and Witbeck




Crews performed maintenance, repairs and upgrades to Utah Transit Authority infrastructure and facilities along the Wasatch Front between North Ogden and Spanish Fork. Under the scope of this project, the team completed 135 individual task orders between January 2021 and October 2024.

This work included grade crossing replacements, bus maintenance facility rehabilitation, rail replacements, crossing and tie replacements, operator relief building installation, bus stop construction, basic track maintenance, insulation joint installation and a variety of concrete slabs. The contractor also installed two types of bus charging systems, including pantograph type chargers and plug-in chargers, both of which required the installation of all necessary infrastructure and base components.

Limited work windows posed the biggest challenge for crews and material deliveries. The contractor scheduled crews around the clock to minimize impacts to UTA customers. Hourly work schedules detailed all activities in each task order, ensuring service was restored at or before the scheduled return to service time.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest Residential/Hospitality: The Arthur | Engineering News-Register
Next Article Best Reform/Restoration: ESI Headquarters Building
Machinery Asia
  • Website

Related Posts

Canada to Wyoming Pipeline Gets Presidential Permit to Go Ahead

May 1, 2026

Bridger Pipeline Expansion Gets Presidential Permit for Canada-Wyoming Crude Line

May 1, 2026

Lessons from the debate over Maine’s data center moratorium on construction

May 1, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Canada to Wyoming Pipeline Gets Presidential Permit to Go Ahead

Bridger Pipeline Expansion Gets Presidential Permit for Canada-Wyoming Crude Line

Lessons from the debate over Maine’s data center moratorium on construction

Construction views to the east | Engineering News-Register

Popular Posts

Canada to Wyoming Pipeline Gets Presidential Permit to Go Ahead

May 1, 2026

Bridger Pipeline Expansion Gets Presidential Permit for Canada-Wyoming Crude Line

May 1, 2026

Lessons from the debate over Maine’s data center moratorium on construction

May 1, 2026

Construction views to the east | Engineering News-Register

May 1, 2026
Heavy Machinery

How to secure a car on a trailer safely step by step

April 30, 2026

Folding car trailer buying guide for small garage and easy storage

April 27, 2026

How does car trailer size affect towing capacity

April 17, 2026

Metal car trailer ramps make loading easier and safer

April 13, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.