Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home ยป Award of Merit, Residential/Hospitality: Great Wolf Lodge Maryland
Industry News

Award of Merit, Residential/Hospitality: Great Wolf Lodge Maryland

Machinery AsiaBy Machinery AsiaOctober 12, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Great Wolf Lodge Maryland

Perryville, Md.

Merit Award


Sent by: Turner Construction Co.

Owner: Great Wolf Resorts Inc.

Principal Design Company and MEP Engineer: Stantec

General contractor: Turner Construction Co.

Civil Engineer: Morris & Ritchie Associates Inc.

Structural Engineer: Forefront Structural Engineers Inc.




The Great Wolf Lodges may look aesthetically similar, but building their largest complex turned out to be as complex as building a hospital, the project team says. The 680,000 square meter facility includes restaurants, a lobby with a special effects audiovisual screen, arcades, a bowling alley, a mirror maze, an indoor climbing area, 22 water slides, a wave pool, a lazy river and one outdoors. swimming pool

To avoid mistakes in the hotel rooms, the team spent a month creating full mock-ups of each room type, so that signatures for fixtures and finishes could be made before the rooms were installed en masse.

Great Wolf Lodge Maryland

Photo courtesy of Turner Construction Co.

Supply chain issues prevented the team’s preferred roofing and truss material from being easily sourced, so the team deployed bar beams and metal roofs with three layers of coating high performance to protect against corrosion in the hot and humid environment of the water park. The team managed the quality control and installation process to ensure the high-performance coating was fully and correctly applied to deliver a long-lasting product.

The team’s use of prefabrication helped speed up the schedule. Several components were constructed off-site and then assembled on-site, ensuring a safer project and reducing the time and effort required for on-site construction.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleMerit Award, Small Project: Supernal Innovation Center
Next Article Sustainability and Office/Retail/Mixed Use: Ryan Resilience Lab
Machinery Asia
  • Website

Related Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Amtrak updates $6 million Baltimore tunnel project

Trump unveils plans for $22.5 million Dulles airport overhaul

Turner’s cost benchmark rose 5.2% in the second quarter

Inspector dead, four workers injured in Kansas interstate construction zone crash

Popular Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026

Inspector dead, four workers injured in Kansas interstate construction zone crash

July 30, 2026
Heavy Machinery

What size car trailer load winch do you need?

July 29, 2026

How to choose a manual winch for your car trailer loading needs

July 27, 2026

How to choose heavy-duty car tow ramps for safe loading

July 27, 2026

What width car trailer do you need for your vehicle?

July 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.