Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home ยป Award of Merit, Residential/Hospitality, Safety Excellence: Kanso Milford
Industry News

Award of Merit, Residential/Hospitality, Safety Excellence: Kanso Milford

Machinery AsiaBy Machinery AsiaNovember 21, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Kanso Milford


Milford, Massachusetts.


EXCELLENCE IN SECURITY and Merit Award, Residential/Hospitality


Presented by AvalonBay Communities Inc.


Owner/General Contractor: AvalonBay Communities Inc.


Main design company: The Architecture Team Inc.


Civil Engineer: Civil Design Group


Structural Engineer: Provide engineers


MEP Engineer: RW Sullivan Engineering


Geotechnical/environmental consultant: Sanborn Head & Associates


Landscape architect: Hawk Design Inc.


Subcontractors: Baystate Engineering Corp.; Commonwealth Electrical Technologies Inc.; Diaz Construction Co.; Fernandes Masonry Inc.; Firestop Associates Inc.; FM Construction Group; Master Framing Inc.; Schlager Co. Inc.




Built on an aggressive 21-month schedule, the $45.4 million multifamily residential development features more than 160 apartments in three mid-rise buildings. The community prioritizes simplicity, functionality and affordability without compromising the quality of living space. Amenities were limited to a dog park, a bus stop, electric vehicle chargers, a grill area, detached garages and a separate recycling/garbage building. Due to the conditions of the site, a well for irrigation was not possible, nor was the use of village water an option. Instead, the team designed a system of three 10,000-gallon concrete tanks to collect and store rainwater from the building’s roofs.

The proximity of the city’s fire department headquarters presented multiple challenges during the construction phase. In addition to requiring close coordination and communication for utility connections to streets that could not be closed for any length of time, the groundwater was contaminated with chemicals from firefighting foam that had been used during training exercises. All deep sewer works and other construction below the water table had to include groundwater treatment before discharge, while saturated excavated soil was stored for testing.

Kanso Milford

Photo by Michael Nesbitt, courtesy of AvalonBay Communities Inc.

The hard granite encountered during construction had to be blasted away to make way for underground utilities and the building’s foundation. The project’s safety plan called for all other construction activities to stop during blasting events, with fire crews on site as an additional precaution.

All subcontractors were pre-qualified to meet the minimum workplace safety requirements of the owner/general contractor. As the timber frame structures took shape, the team implemented a fire suppression and safety program that included the application of fire retardants with spray, surveillance cameras and other measures in accordance with national fire protection standards. All external safety observations were captured in a technology-based management tool, facilitating frequent and effective information analysis to understand project trends, risks and hazards. The results were used to influence performance goals, training, planning and security-related conversations with business partners.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleMerit Award, Excellence in Security: MIT Music Building
Next Article Award of Merit, Sports/Entertainment: Cohen Eastern Greenwich Civic Center
Machinery Asia
  • Website

Related Posts

The $900 million final defense bill passes the House with sweeping acquisition and infrastructure changes

December 12, 2025

Judge rejects bid to halt Hudson Tunnel procurement

December 12, 2025

As demand grows, Swinerton taps into a new solid wood lead

December 11, 2025
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

The $900 million final defense bill passes the House with sweeping acquisition and infrastructure changes

Judge rejects bid to halt Hudson Tunnel procurement

As demand grows, Swinerton taps into a new solid wood lead

Robotics startup Buildroid AI to bring automated model-based palletizing to US workplaces

Popular Posts

The $900 million final defense bill passes the House with sweeping acquisition and infrastructure changes

December 12, 2025

Judge rejects bid to halt Hudson Tunnel procurement

December 12, 2025

As demand grows, Swinerton taps into a new solid wood lead

December 11, 2025

Robotics startup Buildroid AI to bring automated model-based palletizing to US workplaces

December 11, 2025
Heavy Machinery

Aluminum car trailer

December 2, 2025

Wheel Dozer vs. Crawler Dozer

November 20, 2025

Where can I find reliable mini excavator dealers near me?

October 27, 2025

The complete expert guide to faster and smarter cargo transportation

October 27, 2025

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.