Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » Award of Merit — Road/Bridge: 44th Avenue East Extension CMAR
Industry News

Award of Merit — Road/Bridge: 44th Avenue East Extension CMAR

Machinery AsiaBy Machinery AsiaOctober 14, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

44th Avenue East Extension CMAR

Bradenton, Florida

Merit Award

Sent by: SEMA Construction Inc.

Owner: Manatee County Department of Public Works

Main design company: HDR Inc.

General contractor: SEMA Construction Inc.

As the final segment of a multiphase program, this two-mile arterial road completed a long-planned east-west corridor between Interstate 75 and Lakewood Ranch Boulevard.

The crossing was originally planned as a land causeway, but early contractor involvement through the CMAR process led to an alternative 1,800-foot bridge built using marine construction methods, preserving reservoir operations, reducing environmental impacts and saving more than $12 million.

Construction of the I-75 overpass over live traffic required an innovative traffic plan that minimized lane closures. Detailed lift planning, coordinated night work and early simulations near high-voltage and transit lines ensured safe construction.

Crested eagle wetlands, protected habitats, and nesting areas required phased permits and adaptive sequencing. Several hurricanes, including Milton, impacted during construction, but proactive storm preparation and quick recovery minimized impacts. Crews also overcame unsuitable soils and major utility conflicts along the corridor.

The $160 million project opened in August 2025, nine months ahead of schedule.

The final version is approximately 35-40% shorter than the originally planned crossing, but retains the main engineering, environmental and schedule objectives through a bridge-mounted crossing, dam installation and phased drilling and sequencing.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleAward of Merit — Higher Education/Research: Belmont University Wiseman Hall
Next Article Man steals backhoe and takes it for a ride in North Park, police say – NBC 7 San Diego
Machinery Asia
  • Website

Related Posts

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026

Flintco-Mortenson JV begins concrete deck on Oklahoma City’s $900 million NBA stadium

October 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

Kingsport Times News | Local news, weather and sports

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

Blattner is a contractor for the $750 million wind power project in South Dakota

Popular Posts

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

October 17, 2026

Kingsport Times News | Local news, weather and sports

October 17, 2026

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026
Heavy Machinery

How to choose the right car trailer for your vehicle?

October 15, 2026

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.