Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home » Bentley buys Cesium, Geospatial Information and Digital Twin Platform
Industry News

Bentley buys Cesium, Geospatial Information and Digital Twin Platform

Machinery AsiaBy Machinery AsiaSeptember 10, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Bentley Systems acquired the Cesium geospatial information platform, a platform for building 3D geospatial applications. Terms of the Sept. 6 transaction were not disclosed, but it is expected to close by the end of 2024.

The Cesium 3D Tiles standard has been adopted by Google Earth as the map platform’s 3D scene provider through its Map Tiles application program interface. Photorealistic 3D tiles are a textured 3D mesh with high-resolution images that create a scene from user data. Cesium has an open application program interface that allows you to use different types of data, be it image files, GIS information or satellite imagery. Bentley has been promoting an open data approach to design using its tools since the introduction of its iTwin platform for digital twins in 2015. The acquisition of Cesium brings a geospatial platform and the data contained within it to iTwin.

“We’ve made some acquisitions to expand our portfolio and increase the depth of many of our tools in different spaces, including GIS,” said Julien Moutte, chief technology officer at Bentley Systems. “We have a special opportunity here. We’ve believed very early on that we need to bring this portfolio together through a platform game.”

Ever since technology vendors started storing customer project data on cloud-based platforms in the late 2000s, they’ve had to deal with the problem that data needs to be structured differently and can be shared for light transmission. This has meant more open application program interfaces (APIs) such as Cesium’s Map Tiles and more partnerships and acquisitions between companies authoring tools for building information modeling and GIS data, two fields that were once very separate among architecture and engineering and planning professionals. respectively.

“CesiumJS and 3D Tile are this open standard for streaming massive models and that’s not just terrain models, it’s infrastructure models,” said Patrick Cozzi, CEO of Cesium, who will join Bentley as to executive in the agreement. “We’ve guided ourselves to be open, to contribute and engage authentically in the community.”

Data is available for more than 2,500 cities and 49 countries in an open ecosystem of runtimes enabled by 3D Tiles on Cesium servers, including CesiumJS, Unreal, Unity and NVIDIA Omniverse. One customer is equipment manufacturer Komatsu who uses Cesium to monitor construction sites with their equipment.

Moutte characterized the Cesium acquisition as a “duplication” of open data standards in infrastructure design and construction.

“Having an API where you can look at your data but you can never access it is very limiting in a sense,” he said. “We believe that we have to earn the trust of our users, through the features and the value that we provide them, not closing them, not letting them access this data. One of the key pillars of openness not only it’s open. open source and standards, but also open access to APIs.”

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleTerex AC 200-1 Mobile Crane – Poultidis SA
Next Article Volvo G-series wheel loaders: optimized powertrain
Machinery Asia
  • Website

Related Posts

Of the archives: October 22, 1925 | Concrete mixture

May 22, 2025

GRANIT COO JIM RADICH to remove —

May 22, 2025

The renewal of Boston $ 200 million women’s football stadium will not be ready for the opening season

May 22, 2025
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Of the archives: October 22, 1925 | Concrete mixture

GRANIT COO JIM RADICH to remove —

The renewal of Boston $ 200 million women’s football stadium will not be ready for the opening season

Make breaks, Buddy Up: Tips to overcome the heat

Popular Posts

Of the archives: October 22, 1925 | Concrete mixture

May 22, 2025

GRANIT COO JIM RADICH to remove —

May 22, 2025

The renewal of Boston $ 200 million women’s football stadium will not be ready for the opening season

May 22, 2025

Make breaks, Buddy Up: Tips to overcome the heat

May 22, 2025
Heavy Machinery

All you need to know about a 28 -foot car trailer

May 21, 2025

All you need to know about a car trailer

May 21, 2025

Cart of car and useful trailer: What do you need?

May 19, 2025

The definitive guide to choose and use -no a

May 15, 2025

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.