Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » Best Road/Bridge, Excellence in Safety: NE 8th Street Eastrail Crossing
Industry News

Best Road/Bridge, Excellence in Safety: NE 8th Street Eastrail Crossing

Machinery AsiaBy Machinery AsiaDecember 16, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

NE 8th Street Eastrail Crossing


Bellevue, Wash.


BEST PROJECT, HIGHWAY/BRIDGE, and Merit Award, Safety


Presented by Granite Construction Co.


owner King County


Leading design company KPFF Consulting Engineers


General Contractor Granite Construction Co.




As part of the larger Eastrail program that converts 42 miles of former railroad tracks into a multi-use trail, this $18.2 million project serves as a vital link in King County’s shift toward sustainable, transit-oriented transportation.

The scope included a 550-foot-long, six-span steel truss bridge over NE 8th Street, allowing multimodal commuters to safely bypass one of downtown Bellevue’s most dangerous streets.

Ramps on either side double the length of the bridge, while stairs connect directly to the lower level of the light rail station and the RapidRide B line bus stop. The bridge incorporates historical and cultural elements that honor the local contributions of Japanese Americans, including a 121-foot mural, intricate steel display walls and origami-style aluminum cladding.

Maneuvering within a dense urban corridor presented major challenges for the project team. The project team led weekly planning meetings for three months to ensure the bridge could be safely raised during an overnight closure. All approach sections were also assembled on site.

NE 8th Street Eastrail Crossing

Photo by Elizabeth Novy

The 170-foot center bridge was assembled and stored in a narrow area between the concrete Sound Transit guide piers, approach spans, and adjacent properties.

During the night shutdown, the team used specialized motors to navigate extremely tight horizontal and vertical clearances, safely transporting the section from assembly site to assembly site. The main bay was then successfully lifted using two hydraulic cranes.

During construction, the team navigated more than $1.6 million in owner-requested design changes while managing schedule and budget challenges. Solutions were worked out collaboratively.

During 48,000 hours of work, the project team recorded zero lost or recordable time incidents thanks to comprehensive safety protocols and offline construction strategies. To minimize the risk of falls and protect the traveling public while crews worked above live traffic, the team built and mounted the main light at ground level and away from traffic before transporting and mounting it into place. This approach dramatically reduced exposure to fall hazards and traffic-related risks.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest Higher Education/Research Excellence in Sustainability: Washington State University Vancouver Life Sciences Building
Next Article Award of Merit, Interior/Tenant Improvement: Lane Powell Tenant Improvement
Machinery Asia
  • Website

Related Posts

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026

Flintco-Mortenson JV begins concrete deck on Oklahoma City’s $900 million NBA stadium

October 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

Kingsport Times News | Local news, weather and sports

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

Blattner is a contractor for the $750 million wind power project in South Dakota

Popular Posts

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

October 17, 2026

Kingsport Times News | Local news, weather and sports

October 17, 2026

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026
Heavy Machinery

How to choose the right car trailer for your vehicle?

October 15, 2026

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.