Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » Birmingham contractor lands £33m industrial scheme
Industry News

Birmingham contractor lands £33m industrial scheme

Machinery AsiaBy Machinery AsiaNovember 23, 2023No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

GMI Construction Group is set to build a 37,000 sq m industrial center in the West Midlands.

The Birmingham-based firm has been awarded a contract to deliver the £32.9m Urban 8 Logistics Park in the city’s King’s Norton district.

Investor Tristan Capital Partners, developer Canmoor and regeneration specialist St Francis Group are creating the warehouse and logistics facility on a derelict site.

The hub will feature units ranging from 2,300 square meters to 6,500 square meters, all designed to achieve BREAAM Excellent ratings.

Sustainability features include LED lighting, solar power, electric vehicle charging and energy-saving infrastructure.

The isolated units will have composite metal cladding in gray and silver finishes, with glass incorporated in the entrances and office spaces.

Located off Eckersall Road, the 12-acre site near the A441 and A38 was previously used by Pilkington Automotive and GKN Aerospace.

Birmingham City Council granted full planning permission for the logistics scheme in 2021 and the site was cleared in preparation.

GMI Midlands managing director Gareth Jones said: “We are delighted to have been appointed as the main contractor for this high-profile scheme, which will support investment and create jobs by providing logistics and space of manufacturing so necessary”.

The development is due to be completed by the end of next year.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticlePost-2020 Technology Trends: Is the Construction Industry Ready for Another Pandemic?
Next Article Registration for e-Merge 2024 is now live
Machinery Asia
  • Website

Related Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Amtrak updates $6 million Baltimore tunnel project

Trump unveils plans for $22.5 million Dulles airport overhaul

Turner’s cost benchmark rose 5.2% in the second quarter

Inspector dead, four workers injured in Kansas interstate construction zone crash

Popular Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026

Inspector dead, four workers injured in Kansas interstate construction zone crash

July 30, 2026
Heavy Machinery

What size car trailer load winch do you need?

July 29, 2026

How to choose a manual winch for your car trailer loading needs

July 27, 2026

How to choose heavy-duty car tow ramps for safe loading

July 27, 2026

What width car trailer do you need for your vehicle?

July 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.