Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » Cheshire housebuilder collapsed due to £12m
Industry News

Cheshire housebuilder collapsed due to £12m

Machinery AsiaBy Machinery AsiaJune 6, 2023No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Cheshire housebuilder Lane End Developments Construction owed almost £12m when it collapsed in April, it has emerged.

A report by its administrators shows the affordable housing specialist owed 412 unsecured creditors a total of £11.8m.

One supplier, security services provider Monitored Guarding, was owed more than £800,000, while 26 others were left out of pocket for more than £100,000.

Among the biggest creditors were builders’ merchant Huws Gray (£323,000), Lancashire & Cumbria Demolition (£226,000) and Sheffield-based Green Piling (£214,000).

The Warrington-based builder went into administration after talks with a potential buyer broke down earlier this year.

Its 112 employees were made redundant in April after it became clear the company did not have enough working capital to continue operating in administration.

The company, which had a turnover of £81.1m in the year to 31 May 2022, said inflation and material shortages had posed “continued challenges”.

Established in 2016, Lane End completed over 1,100 homes across 14 sites in the North West of England, mainly for social housing providers.

Among the providers it worked with were Clarion, Jigsaw, Trafford Housing Trust, Onward and Stockport Homes.

Administrator Quantuma Advisory said it was unable to provide creditors with an estimated profit and loss statement as there was “a lot of uncertainty” about the realization of assets for the benefit of the administration’s property.

“The joint administrators will try to update all creditors with a statement of results in future progress reports,” he said.

In its latest reported financial results, the builder made a pre-tax profit of £245,000, while cash levels fell by more than £3m to £2.7m .

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleWhat to do if a transport company scams you
Next Article Soviet Machine Guns of World War II (Weapon)
Machinery Asia
  • Website

Related Posts

Canada to Wyoming Pipeline Gets Presidential Permit to Go Ahead

May 1, 2026

Bridger Pipeline Expansion Gets Presidential Permit for Canada-Wyoming Crude Line

May 1, 2026

Lessons from the debate over Maine’s data center moratorium on construction

May 1, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Canada to Wyoming Pipeline Gets Presidential Permit to Go Ahead

Bridger Pipeline Expansion Gets Presidential Permit for Canada-Wyoming Crude Line

Lessons from the debate over Maine’s data center moratorium on construction

Construction views to the east | Engineering News-Register

Popular Posts

Canada to Wyoming Pipeline Gets Presidential Permit to Go Ahead

May 1, 2026

Bridger Pipeline Expansion Gets Presidential Permit for Canada-Wyoming Crude Line

May 1, 2026

Lessons from the debate over Maine’s data center moratorium on construction

May 1, 2026

Construction views to the east | Engineering News-Register

May 1, 2026
Heavy Machinery

How to secure a car on a trailer safely step by step

April 30, 2026

Folding car trailer buying guide for small garage and easy storage

April 27, 2026

How does car trailer size affect towing capacity

April 17, 2026

Metal car trailer ramps make loading easier and safer

April 13, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.