Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Communities Hoping to Build Disaster Resilience Apply for $8 Million in FEMA Grants
Industry News

Communities Hoping to Build Disaster Resilience Apply for $8 Million in FEMA Grants

Machinery AsiaBy Machinery AsiaMarch 22, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Dive brief:

  • According to a March 20 news release, communities applied for nearly $8 billion in federal funding to build disaster resilience through two major Federal Emergency Management Agency grant programs this year fiscal cycle
  • The record request is more than four times the $1.8 billion FEMA has available for assistance programs for flood mitigation and building resilient infrastructure.
  • “This continues the trend of more subapplications being submitted each year than funding is available,” FEMA said in a news release. The agency defines subapplicants as state agencies, local governments, and other eligible entities that receive awards through applicants, which are states, tribes, and territories.

Diving knowledge:

FEMA describes the BRIC and FMA programs as some of the most flexible for communities seeking protection from wildfires, drought, extreme heat, hurricanes, earthquakes, increased flooding and other natural disasters.

However, not all communities have had equal access to the programs. Bigger cities that already have more resources tend to be more successful in winning funding for projects through the BRICs, according to a September analysis by research group Headwaters Economics.

When BRIC and FMA applications for this fiscal cycle opened in October, the agency announced “key changes”. reduce the financial and administrative burden about the applicants. FEMA allowed projects under $1 million to skip a full cost-benefit analysis and is covering up to 90% of project costs in disadvantaged communities.

By the numbers

1,233

Subapplications received by FEMA for the Building Resilient Communities and Infrastructure program. Requests totaled $5.6 billion versus the $1 billion the agency made available this funding cycle.

424

Subapplications received by FEMA for the Flood Mitigation Assistance Program. The requests total nearly $2.3 billion. The agency made $800 million available this funding cycle. An additional $300 million was provided through the Swift Current funding opportunity.

133

Subapplications received by FEMA for Building Code Plus-Up, a new opportunity under BRIC to help states, DCs, territories, and federally recognized tribes modernize building codes. The requests total more than $52 million.

164

Applications received by FEMA for BRIC Direct Technical Assistance, which helps communities that may have fewer resources begin climate resilience planning and project solution design. FEMA expects to select at least 80 of these submissions.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleArmy hires Turner for $133 million West Point stadium renovation
Next Article The DOE is targeting $475 million at mining sites for clean energy projects
Machinery Asia
  • Website

Related Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Amtrak updates $6 million Baltimore tunnel project

Trump unveils plans for $22.5 million Dulles airport overhaul

Turner’s cost benchmark rose 5.2% in the second quarter

Inspector dead, four workers injured in Kansas interstate construction zone crash

Popular Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026

Inspector dead, four workers injured in Kansas interstate construction zone crash

July 30, 2026
Heavy Machinery

What size car trailer load winch do you need?

July 29, 2026

How to choose a manual winch for your car trailer loading needs

July 27, 2026

How to choose heavy-duty car tow ramps for safe loading

July 27, 2026

What width car trailer do you need for your vehicle?

July 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.