Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home » Construction hiring is slowed down to the lowest rate ever recorded
Industry News

Construction hiring is slowed down to the lowest rate ever recorded

Machinery AsiaBy Machinery AsiaMay 1, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Do us know if you have comments.

Brief of diving:

  • The construction openings of the construction industry decreased 38,000 last month, even when hiring in the sector slowed down to the lowest rate of the register, According to the associated builders and contractors United States Work Statistics Office Data Analysis launched Tuesday.
  • The construction industry had 248,000 labor openings on March, dropping 90,000 of the same time last year, a decrease of 27%. The total number of contracts also decreased Yoy, falling by 10%.
  • “Construction work openings continued to tend to the trend in March, a clear sign of curbing the demand for work throughout the industry,” said Anirban Basu, an ABC chief economist, in the statement. “The contracting activity was especially weak during the month, with the 302,000 hires equivalent to only 3.6% of jobs throughout the industry, the lowest rate ever recorded.”

Divide vision:

Basu said he also underwent abandonment and dismissal activity.

“While most contractors surveyed in March expect to increase staff levels over the next six months according to ABC’s Construction trust indexThe rates and other economic heads may contain the recruitment expectations in the coming months. “”

Although some new development of the work is underway in response to the last round of rates by President Donald Trump, many developers and owners are pulling back About new projects due to uncertain economic conditions.

Intel chip maker has delayed the construction of his Ohio semiconductor plantTo a large extent due to the increase in construction costs and the demand for chip weaker than expected. Microsoft, in the same way, Recently did several data center projects In the United States, citing a slowdown in the regional demand for cloud services.

The technology giant paused three developments from the Ohio Data Center, including a $ 1 billion project outside Columbus, and has also delayed constructions in Illinois, North Dakota and Wisconsin, according to Bloomberg.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleJacobs-Mccourt Bost Boston-Area Road Project Books
Next Article The Rehabilitation Program of the building of St. Louis Halts amid alleged fraud complaints
Machinery Asia
  • Website

Related Posts

PCL, stantec $ 600 million scheme expansion of the San Diego Wastewater Treatment Plant

June 21, 2025

2Q 2025 Cost Report: Executive confidence falls as rules of uncertainty

June 21, 2025

Stay Cable Stay, Bi-Teign chosen for Brent Spence Bridge Connecting Ohio and Kentucky

June 21, 2025
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

PCL, stantec $ 600 million scheme expansion of the San Diego Wastewater Treatment Plant

2Q 2025 Cost Report: Executive confidence falls as rules of uncertainty

Stay Cable Stay, Bi-Teign chosen for Brent Spence Bridge Connecting Ohio and Kentucky

Fisher Sand & Gravel awarded a $ 309 million contract for Tucson border wall work

Popular Posts

PCL, stantec $ 600 million scheme expansion of the San Diego Wastewater Treatment Plant

June 21, 2025

2Q 2025 Cost Report: Executive confidence falls as rules of uncertainty

June 21, 2025

Stay Cable Stay, Bi-Teign chosen for Brent Spence Bridge Connecting Ohio and Kentucky

June 21, 2025

Fisher Sand & Gravel awarded a $ 309 million contract for Tucson border wall work

June 20, 2025
Heavy Machinery

7 Tips to maximize the life of the useful trailer tires

June 20, 2025

The smart way to transport vehicles

June 18, 2025

All you need to know about one -axis utility trailers

June 16, 2025

Smart choice for easy transportation from vehicles

June 16, 2025

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.