Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Construction team chosen for $320 million hospital on Chicago’s Southeast Side
Industry News

Construction team chosen for $320 million hospital on Chicago’s Southeast Side

Machinery AsiaBy Machinery AsiaMarch 30, 2026No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

A construction team has been named to build a new $320 million hospital in Chicago, slated to replace the roughly 120-year-old Advocate Trinity Hospital and part of a more than $1 billion project to transform health care in the city’s Southeast End.

The team appointed by North Carolina Hospital System, Advocate Heath, includes Power Construction and Ujamaa as general contractor, CannonDesign as architect, and Magnusson Klemencic Associates and SR+A as structural engineers.

The Chicago Plan Commission on March 20 approved the five-story, 183,000-square-foot hospital for a 23-acre site at 8000 DuSable South Lake Shore Drive. It is just north of the Illinois Quantum and Microelectronics Park, a 440-acre quantum innovation campus under construction on the former US Steel South Works site, and inland from Lake Michigan.

The hospital plan foresees 52 beds, three operating theatres, support and administrative rooms and 368 parking spaces.

Construction is expected to begin this year and be completed by June 2029. When the new hospital is operational. the current Trinity Hospital at 2320 East 93rd Street will be demolished, converted to green space and eventually redeveloped.

“Establishing this replacement hospital and discontinuing the outdated facility is part of a larger strategic vision and plan to improve access to care and health care outcomes on the South Side through an expansive outpatient program in the area,” Advocate Health states in its application to the Illinois Health Services and Facilities Review Board, which approved the plan in June 2025.

The hospital’s design is proposed to include bird-safe technology to deter collisions, native and adapted plantings to support migratory birds and pollinator species, and stormwater management systems to prevent pollutants from entering Lake Michigan and the Calumet River. In addition, Advocate will address any environmental issues before construction begins on the new hospital, the hospital system said.

Advocate Health also plans to spend $500 million to develop ten new neighborhood health care locations located in churches and community centers to treat health problems such as the flu or the common cold, expand an outpatient clinic and add a mobile medicine vehicle to provide access to primary care in multiple locations.

He also plans to invest more than $200 million in inpatient and outpatient programs and services, expanding chronic disease management and addressing social factors that affect health, such as access to healthy food, housing, transportation and prescriptions, and spend $25 million on workforce training efforts.

“This represents an important step in the process as we continue to work to address long-standing gaps in patient access to care in our South Side communities,” the hospital system said.

The hospital plan still needs to be approved by the Chicago City Council.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleNew Euro projects seek to scale innovations in carbon reduction
Next Article Chicago contractor working to increase minority participation in $7 million 1901 project Murdered
Machinery Asia
  • Website

Related Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Amtrak updates $6 million Baltimore tunnel project

Trump unveils plans for $22.5 million Dulles airport overhaul

Turner’s cost benchmark rose 5.2% in the second quarter

Inspector dead, four workers injured in Kansas interstate construction zone crash

Popular Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026

Inspector dead, four workers injured in Kansas interstate construction zone crash

July 30, 2026
Heavy Machinery

What size car trailer load winch do you need?

July 29, 2026

How to choose a manual winch for your car trailer loading needs

July 27, 2026

How to choose heavy-duty car tow ramps for safe loading

July 27, 2026

What width car trailer do you need for your vehicle?

July 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.