Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » Critical Path | Engineering News-Register
Industry News

Critical Path | Engineering News-Register

Machinery AsiaBy Machinery AsiaNovember 26, 2024No Comments5 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

After many hours of review, discussion and debate, industry judges have chosen 20 projects as ENR’s best of the best, representing the pinnacle of design and construction achievement in their respective categories from around of the USA.

The competition began last March with a call for proposals, which resulted in more than 800 project teams submitting their best work to the regional Best Projects competitions. In each of the 10 regions, the editors assembled a panel of judges to select winners in 18 construction industry categories from entries made between May 2023 and May 2024. Projects were also chosen for special awards that they cited Excellence in Safety and Excellence in Sustainability.

The regional winners chosen in each category went on to the national competition – more than 200 projects in total. A new panel of 19 judges from across the U.S. and industry sectors examined each project to choose the best of the best based on teamwork, safety, overcoming challenges, innovation and quality.

The judges were Joe Cazares, Jacobs; Nicholas DeNichilo, Mott MacDonald (retired); Keith Douglas, The Whiting-Turner Contracting Co.; Bart Eberwein, Hoffman Corp. (retired); Camilo Garcia, DPR; Emily Harrold, Multi.studio; Sam Hassoun, GLA Corp.; Randy Iwasaki, Iwasaki Consulting Services; Parham Khoshkbari, Google; A. Ben Perrone, Sundt; Rachel Rasmussen, Architekton; John Schaufelberger, University of Washington College of Built Environments; Cliff Schexnayder, Del E. Webb School of Construction, Arizona State University; Brad Tackett, Sundt; and Claire Weisz, WXY Studio.

Safety experts Steve Acosta of Blach Construction and Carl Heinlein of American Contractors Insurance Group judged the Excellence in Safety award, reviewing incident rates, man hours and innovation in safety programs to determine the winner.

Green building experts Yayu Lin of Northern California’s Sares Regis Group and Shefali H. Sanghvi of Dattner Architects selected the Excellence in Sustainability honoree based on the level of innovation and intensity of the strategy of sustainability of a project and the success of its result.

The winning projects will be featured in more depth in ENR magazine on March 17, 2025. Also in this issue, ENR editors, in collaboration with the judges, will select three finalists for Project of the Year which will include The Project of the Year. Finalists will be revealed in the coming weeks.

Join the winners in New York City on March 27, when the project teams will receive their awards at a brunch at Pier Sixty, Chelsea Piers in New York City, and later recognized, along with the 25 best news producers and the winner of the award for excellence, during the annual edition of ENR. Excellence Award Gala that night at Pier Sixty.

For more information, visit https://www.enr.com/enr-award-of-excellence.

Stay tuned for the launch of next year’s US Best Projects regional competition. For more information, visit last year’s entry page at www.enr.com/bestprojects/ Entry dates and eligibility will be updated once the call opens in the spring.

Airport/Traffic

Northwest Phase II Extension Light Rail Transit, located in Phoenix. Originally Posted by Kiewit-McCarthy Joint Venture (KMJV) a ENR southwest

Cultural/Cult

Missouri Botanical Garden Jack C. Taylor Visitor Center, located in St. Louis, Missouri. Originally Posted by IMEG Corp. a ENR mid west

Energy/Industrial

Baytown Supermodule Furnace, located in Baytown, Texas. Originally Posted by PCL Industrial Construction Co. a ENR Texas and Louisiana

Excellence in security

Midtown Union, located in Atlanta. Originally Posted by Brasfield and Gorrie a ENR southeast

Excellence in sustainability

County of San Mateo County Office Building 3 (COB3), located in Redwood City, Calif. Originally Posted by Truebeck Construction a ENR California

Government/public building

San Diego County Southeastern Live Well Center, located in San Diego. Originally Posted by PCL construction a ENR California

Health Care

Mayo Clinic AZ Bold Forward West Expansion, located in Phoenix. Originally Posted by DPR construction a ENR southwest

Higher Education/Research

Advanced Engineering Building at the University of Nevada, Las Vegas, located in Las Vegas. Originally Posted by CORE construction a ENR southwest

road/bridge

Replacement of tower lifts and various. Rehabilitation of the Marine Parkway-Gil Hodges Memorial Bridge (MP-09), located in Brooklyn, New York Originally Posted by Kiewit Infrastructure Co. a ENR new york

Interior/tenant improvement

Google St. John’s Terminal, located in New York City. Originally Posted by Tone of the structure a ENR new york

K-12 education

Bard High School Early College, located in Washington, DC Originally Posted by MCN Build a ENR Middle Atlantic

Landscape/Urban Development

East Midtown Greenway, located in New York City. Originally Posted by Skanska a ENR new york

Manufacturing

United Therapeutics Phase 5 cGMP Warehouse, located in Durham, North Carolina Originally Posted by DPR construction a ENR southeast

Office/Retail/Mixed Use

The Aerie On-Mountain Restaurant, located in Frisco (Copper Mountain), Colo. Originally Posted by Hyder Construction a ENR mountain states

Reform/Restoration

Victory Lofts, located in Johnson City, New York Originally Posted by LeChase Construction Services LLC a ENR new york

Residential/Hospitality

The Fifth Avenue Hotel, located in New York City. Originally Posted by CNY Group a ENR new york

Small Project

Reconstruction of the Spellacy Bridge, located in Holmes County, Ohio. Originally Posted by Kokosing Construction Co. Inc. a ENR mid west

Construction specialty

Minnesota Zoo Treetop Trail, located in Apple Valley, Minnesota. Originally Posted by PCL construction a ENR mid west

Sports/Entertainment

Expansion of the Colorado Convention Center, located in Denver. Originally Posted by Hensel Phelps a ENR mountain states

Water/Environment

Denver North Water Treatment Plant, located in Arvada, Colorado. Originally Posted by GBSM Inc. a ENR mountain states

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleNavigation of sustainability provisions in construction contracts
Next Article California builder launches contech investment arm
Machinery Asia
  • Website

Related Posts

Mesabi Metallics plans $15 million Iowa steel mill, has $3 million investment in Minnesota iron ore mine

September 30, 2026

TBMs start digging for the Hudson Tunnel project

September 30, 2026

The DOT review took $65.8 million out of the seven previously selected RAISE projects

September 29, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

How to choose between single axle and tandem axle trailers

Mesabi Metallics plans $15 million Iowa steel mill, has $3 million investment in Minnesota iron ore mine

TBMs start digging for the Hudson Tunnel project

The DOT review took $65.8 million out of the seven previously selected RAISE projects

Popular Posts

How to choose between single axle and tandem axle trailers

September 30, 2026

Mesabi Metallics plans $15 million Iowa steel mill, has $3 million investment in Minnesota iron ore mine

September 30, 2026

TBMs start digging for the Hudson Tunnel project

September 30, 2026

The DOT review took $65.8 million out of the seven previously selected RAISE projects

September 29, 2026
Heavy Machinery

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

2 Place Car Trailer: How To Choose The Right Two Car Transporter For Vehicle Transport?

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.