Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » Critical Path | Engineering News-Register
Industry News

Critical Path | Engineering News-Register

Machinery AsiaBy Machinery AsiaFebruary 16, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

02_2024_BestoftheBest_blogpost_ENRwebready.jpg

From left: Microsoft Thermal Energy Center in Redmond, Washington; the National Bio- and Agro-Defense Facility in Manhattan, Kan.; and the recapitalization of the dry dock at Kings Bay, St. Marys, Ga.

Images provided by contestants

A diverse trio of challenging and impressively presented projects have made it through several rounds of judging to emerge as finalists for Project of the Year in ENR’s Best of the Best 2023 competition.

Last month, the 20 project category winners were recognized from more than 800 entries submitted in 12 regional competitions and reviewed by several industry juries. Of those selected, further review produced a handful of projects considered candidates for the highest recognition.

ENR editors then reviewed this list of projects, evaluating performance in meeting the criteria of innovation in design and construction and quality, safety and community impact— and after considerable discussion and debate — selected the following as finalists for the top prize.

In alphabetical order, they are:

Recapitalization of the Kings Bay Dry Dock, located in St. Marys, Ga. and originally presented by Alberici-Mortenson, A Joint Venture a ENR Southeast

Microsoft Thermal Energy Center, located in Redmond, Wash. and originally submitted by GLY Construction a ENR Northwest

National Bio and Agro-Defense Facility (NBAF), located in Manhattan, Kan. and originally presented by McCarthy Mortenson Joint Venture in ENR Midwest

The finalists, as well as all category-winning projects and recognition from numerous industry members who were Best Of The Best judges, will be detailed in the March 11 print issue of ENR, with the Project of the Year to be revealed on its cover.

Scoot Judy

Scott Judy is deputy editor of Regions and publisher of ENR Southeast, one of the 10 regional publications of the Engineering News-Record. His roughly 27 years as a construction journalist began with an 11-year stint covering construction projects in the Midwest. In 2000, Judy helped launch the publication now known as ENR Southeast. He often delves into controversial aspects of the construction industry, such as bankruptcies and fatal accidents, and wishes he never had to cover another accident, but suspects he will.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleFAA picks winners for $970 million in airport terminal grants
Next Article ENR 2023 photo contest of the year in construction
Machinery Asia
  • Website

Related Posts

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026

Flintco-Mortenson JV begins concrete deck on Oklahoma City’s $900 million NBA stadium

October 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

Kingsport Times News | Local news, weather and sports

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

Blattner is a contractor for the $750 million wind power project in South Dakota

Popular Posts

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

October 17, 2026

Kingsport Times News | Local news, weather and sports

October 17, 2026

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026
Heavy Machinery

How to choose the right car trailer for your vehicle?

October 15, 2026

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.