Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » ENR 2024 Top 500 Sourcebook: Columbus Airport plans sleek new terminal
Industry News

ENR 2024 Top 500 Sourcebook: Columbus Airport plans sleek new terminal

Machinery AsiaBy Machinery AsiaJuly 16, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Opened at the dawn of the space age, the 66-year-old terminal at John Glenn Columbus International Airport in Columbus, Ohio, will soon give way to a new facility that embodies the aspirations of air travel in the 21st century.

Designed by a team led by Gensler with local partner Moody Nolan, the new 1 million square meter terminal is the result of more than two decades of planning and research. With a gently curved exterior profile inspired by Midwestern skylines and waterways, the two-level, 36-gate terminal will handle 13 million passengers annually, nearly double the airport’s current volume. Features include a consolidated security checkpoint, a central market with views of the airfield and Columbus, and a pedestrian bridge connecting to the airport’s rental car center and a new 5,000-vehicle parking garage equipped with electric vehicle charging technology.

The estimated $2 billion construction program includes surface roads, platform and taxiways, and underground infrastructure. According to the Columbus Regional Airport Authority, funding will come from a combination of federal and bond sources backed by future revenue from airlines and tenant companies, passenger user fees, parking and concessions.

Other sustainability elements include smart glass and other efficient design materials for natural lighting, energy-efficient building systems, hydration stations for reusable water bottles, and extensive reuse of reclaimed water.

At-risk construction manager Hensel Phelps and Columbus-based general contractor Elford will begin the four-year construction phase next year.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleZoomlion ZE370E 10 EXCAVATOR
Next Article Liebherr – LRT 1130-2.1 – The toughest in the roughest
Machinery Asia
  • Website

Related Posts

Project Challenge: Installing ‘Wheat Columns’ in U.K.’s $450 Million Stadium Renovation

July 17, 2026

New York expands old Pfizer HQ probe as engineer says booster never installed

July 17, 2026

Skanska reports a record $7 million in orders for the second quarter

July 17, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

How much does it cost to rent a minicar? Price guide 2026 – Minicarretes direct

Project Challenge: Installing ‘Wheat Columns’ in U.K.’s $450 Million Stadium Renovation

New York expands old Pfizer HQ probe as engineer says booster never installed

Skanska reports a record $7 million in orders for the second quarter

Popular Posts

How much does it cost to rent a minicar? Price guide 2026 – Minicarretes direct

July 17, 2026

Project Challenge: Installing ‘Wheat Columns’ in U.K.’s $450 Million Stadium Renovation

July 17, 2026

New York expands old Pfizer HQ probe as engineer says booster never installed

July 17, 2026

Skanska reports a record $7 million in orders for the second quarter

July 17, 2026
Heavy Machinery

Is a tilt deck trailer better than ramps?

July 17, 2026

What to check before towing a car trailer in the summer

June 24, 2026

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.