Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home ยป Global Review 2025+: Relics and railway work converge in Rome
Industry News

Global Review 2025+: Relics and railway work converge in Rome

Machinery AsiaBy Machinery AsiaDecember 24, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

822B
Global air traffic, measured in passenger kilometers entered, in October.

Source: International Air Transport Association

Construction of Rome’s Metro C automated transit line reached a milestone in late December, with the opening of a 2-mile underground extension from the system’s temporary terminus in San Giovanni to the city center. The expansion includes two new stations, one of which is next to the Coliseum.

Built by a consortium led by Italy’s Webuild and Vianini Lavori for Roma Metropolitane, the city’s metro authority, the project has been a literal deep dive into the history of the Eternal City. Excavations revealed layers of ancient Roman structures and artifacts, including a 2,000-year-old military barracks, a residence with rooms with frescoes and mosaics, nearly 30 ancient wells, and hundreds of artifacts.

The construction of the Piazza Venezia metro station continues. Using a 185-ton hydromill, workers are excavating an 85-foot-deep perimeter for the installation of 170 5-foot-thick diaphragm walls. The team will then coordinate the excavation of the station’s six levels of 48,400 square meters alongside archaeological work that has uncovered Roman and medieval structures, including the remains of the ancient Via Flaminia and multi-storey residential complexes. More than 1,500 instruments have been installed in churches and adjacent historic buildings to monitor construction. The station is scheduled to open in 2032.

Conceived as a 26-mile, 29-station system to improve mobility between Rome and the city’s eastern suburbs, Line C has been built in stages over the past two decades, with about 22 miles now in operation. Next year, Webuild and Vianini Lavori will begin construction on the next 2.5-mile segment.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleEconomy of nothing | Engineering News-Register
Next Article Global Review 2025+: Brunei accepts first deepwater gas development project
Machinery Asia
  • Website

Related Posts

At least 30 dead in pair of construction cranes collapse in Thailand

January 19, 2026

Second Avenue subway plan calls for $5-7 million Harlem extension

January 19, 2026

The nation’s first black indoor tennis club steps up

January 19, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

At least 30 dead in pair of construction cranes collapse in Thailand

Second Avenue subway plan calls for $5-7 million Harlem extension

The nation’s first black indoor tennis club steps up

Metal Car Trailer Basics for Everyday Transport

Popular Posts

At least 30 dead in pair of construction cranes collapse in Thailand

January 19, 2026

Second Avenue subway plan calls for $5-7 million Harlem extension

January 19, 2026

The nation’s first black indoor tennis club steps up

January 19, 2026

Metal Car Trailer Basics for Everyday Transport

January 19, 2026
Heavy Machinery

Metal Car Trailer Basics for Everyday Transport

January 19, 2026

Safe car trailer winch setup explained

January 19, 2026

A practical and everyday solution to carry more by bike

January 19, 2026

A practical, no-nonsense guide to transporting large boats safely

January 19, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.