Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » Ground stabilization work awarded for a $16 million Gateway project
Industry News

Ground stabilization work awarded for a $16 million Gateway project

Machinery AsiaBy Machinery AsiaNovember 6, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

Award: Ground stabilization by tunnel
Value: 284 million dollars
Location: New York City
Customer: Gateway Development Commission

Preliminary work is underway on the first heavy construction contract for the Hudson Tunnel project, according to Danish civil engineering firm Cowi.

The Gateway Development Commission awarded a $284 million design-build contract Hudson River Soil Stabilization Project to Kiewit subsidiary Weeks Marine earlier this year. Cowi will serve as design director and engineer of record for the New York City job, the company said in an Oct. 29 press release shared with Construction Dive.

The work is part of the $16 billion Gateway program, which will double capacity on the rail segment of Amtrak’s Northeast Corridor connecting New Jersey and New York City.

Design of the containment structure is underway and construction of a test cofferdam was completed in October, according to Cowi. Construction work is expected to begin next summer.

The overall Hudson Tunnel Project involves building a new two-track rail tunnel under the Hudson River between North Jersey and Manhattan, then rehabilitating the 110-year-old tunnel that was severely damaged by Hurricane Sandy in 2012 .The decaying tunnel is a bottleneck for New Jersey Travelers and Amtrak passengers, and President Joe Biden called the program Gateway “One of the largest and most consequential projects in the country.”

Weeks Marine will amend and stabilize the soil in the shallow area of ​​the river near the Manhattan shoreline. This will prepare the ground for the tunnel boring machine that will dig the new tunnel and ensure the riverbed is protected from disruptions, according to a LinkedIn post by Omaha, Neb.-based Kiewit.

Cowi is responsible for developing a temporary containment structure to protect the river bed from disruption as it works with Weeks Marine and its ground improvement subcontractor, Keller Group. Crews will complete each of the two 600-foot sections sequentially to minimize the impact on boat traffic, according to Cowi.

The full soil stabilization project is expected to be complete by 2027, according to Cowi.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleMid-Atlantic Monitor | Engineering News-Register
Next Article Construction eagerly awaits the results of the US election
Machinery Asia
  • Website

Related Posts

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026

Flintco-Mortenson JV begins concrete deck on Oklahoma City’s $900 million NBA stadium

October 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

Kingsport Times News | Local news, weather and sports

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

Blattner is a contractor for the $750 million wind power project in South Dakota

Popular Posts

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

October 17, 2026

Kingsport Times News | Local news, weather and sports

October 17, 2026

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026
Heavy Machinery

How to choose the right car trailer for your vehicle?

October 15, 2026

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.