Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป HMAS Coonawarra dredging campaign from next week
Backhoe Loader

HMAS Coonawarra dredging campaign from next week

Machinery AsiaBy Machinery AsiaDecember 1, 2023No Comments1 Min Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

The Northern Territory Government of Australia has provided an update to harbor users on the upcoming HMAS Coonawarra – Darwin Harbor dredging campaign.

Photo courtesy of the Royal Australian Navy

According to the notification, Duratec Australia / HALL Contracting are to carry out dredging operations within the harbor of HMAS Coonawarra.

The aim of the project is to provide full-tide navigational access to the HMAS Coonawarra basin for new deeper-draft Australian naval vessels.

Dredged material removed by a cutter suction dredger (soft clay) will be discharged into Darwin Harbor at a location approximately 300m south-west of the dredging areas.

Rock material removed by the backhoe dredger will be barged to the East Arm Wharf ponds for land disposal.

Dredging operations will take place from 5 December 2023 to April 2024, during daytime hours only (6:30am to 6:00pm Monday to Saturday) with no dredging on Sundays or public holidays.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleReading the fire: The crane driver tells of a dramatic rescue
Next Article Best Renovation/Restoration Project: The Warehouse Food Hall
Machinery Asia
  • Website

Related Posts

Martin Smith was crowned Scottish Champion of the 2024 Plant Operators Challenge

July 30, 2024

APOLLO 60HP TRACTOR + 4 IN 1 LOADER + BACKHOE for sale (reference code TA919034)

July 29, 2024

Government procures heavy-duty road construction machines for MMDA

July 28, 2024
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Amtrak updates $6 million Baltimore tunnel project

Trump unveils plans for $22.5 million Dulles airport overhaul

Turner’s cost benchmark rose 5.2% in the second quarter

Inspector dead, four workers injured in Kansas interstate construction zone crash

Popular Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026

Inspector dead, four workers injured in Kansas interstate construction zone crash

July 30, 2026
Heavy Machinery

What size car trailer load winch do you need?

July 29, 2026

How to choose a manual winch for your car trailer loading needs

July 27, 2026

How to choose heavy-duty car tow ramps for safe loading

July 27, 2026

What width car trailer do you need for your vehicle?

July 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.