Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Inaccurate time records are a major contractor compliance blind spot
Industry News

Inaccurate time records are a major contractor compliance blind spot

Machinery AsiaBy Machinery AsiaJuly 20, 2026No Comments5 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

Editor’s note: Nic De Bonis is CEO and co-founder of workforce management software provider Workyard. The opinions are the author’s own.

I’ve had enough contractor conversations to notice when an industry has a blind spot. This is one of them.

Contractors run lean operations. They fix the prices of the jobs up to the hour, know their material costs and observe the margin of each offer. What most of them never stop to think about is whether their time records might hold up in a deposition two years from now.

This is the gap. Inaccurate time records aren’t just a payroll inconvenience. For most contractors, they are an invisible compliance liability, one that remains invisible until a former employee files a claim and records can answer the question.

The wrong problem

Nic De Bonis is CEO of workforce management software provider Workyard

Nic De Bonis

Courtesy of Workyard

In sales conversations with more than 180 mid-market construction contractors, nearly half came to us focused on payroll efficiency or workforce visibility. They talk about time sheets arriving late, foremen checking in the entire crew without checking anyone, hours that didn’t match what the superintendent remembered. These are real problems, no doubt.

But only 4% cited compliance or legal exposure as a reason for talking to us.

Of the contractors who tracked time on paper or spreadsheets, 72% never brought up a compliance issue once in conversation. I don’t think they are scornful. It just hadn’t occurred to them that their records might not hold up if challenged.

They were managing the risk they could see and completely missing what they couldn’t.

Why this risk is different

Most construction compliance failures require an actual mistake. Security breaches, misclassification, and prevailing wage gaps all imply that something has gone wrong. Fix the bug, fix the problem.

Record keeping doesn’t work like that.

A contractor can pay every worker accurately, at the right rate, and on time, and still lose a wage claim because the records to prove it aren’t kept.

Under the Fair Labor Standards Act, workers have two years to present (three if it is considered a willful infringement). When a claim arrives, the employer must rebuild all relevant shifts. This is difficult with just a paper login sheet and just as difficult with an Excel file with no change history. The memory of a foreman against that of a former worker? This is not a test.

Mathematical compounds. Workers can claim back wages plus an equal amount in liquidated damages, meaning a $50,000 overtime dispute turns into $100,000 before attorney fees.

The Department of Labor’s Wage and Hour Division recovered more than 259 million dollars in back wages for nearly 177,000 workers by fiscal year 2025. In the construction sector specifically, an enforcement push produced more than 3,000 investigations in a single year and $36 million recovered for 21,000 workers. The most frequently detected violations were overtime calculation errors, uncompensated travel time and undocumented breaks.

These are registry errors, not intentional errors.

One thing most contractors don’t realize until they’re there: the legal system doesn’t evaluate whether you’ve paid correctly, it evaluates whether you can prove it. They are two different standards, but the industry is only ready for one of them.

What contractors say after the fact

The conversations that get me are not the ones about efficiency. They are those where a contractor describes a situation they did not see coming.

A contractor ended up in a lawsuit over a worker’s claim that he never got a lunch break. There was nothing in the records to the contrary.

Another, after learning of similar claims, said he also had no way of proving his crews had taken their breaks.

A third described their standard daily process: Supervisors collected signatures at the start of the shift, but rest periods and exits went undocumented. Nothing in writing confirmed what actually happened between check-in and check-out.

Each of these contractors kept track of time. None of them had records that were kept when they were tested.

The rethinking that the industry needs

Contractors who come from intact wage claims share one trait: They treated time records as legal documents before anyone asked them to. They deliberately have time-stamped entries, break confirmations that workers start, or a record of who changed what and when.

I understand why this rethinking is difficult.

Time tracking is introduced to contractors as a payroll tool, making payroll execution faster. This framing is accurate, but a lawyer or DOL investigator does not consider time records to be a payroll artifact. They look at them as proof.

The good news is that solving this doesn’t require reinventing the way you run a job. The best time tracking systems handle the problem of legal records quietly in the background without adding much to a foreman’s daily routine.

Systems that do this well share three characteristics:

  • Workers come in and out with a sign confirming that breaks have been taken.
  • GPS provides a secondary layer of accuracy that doesn’t depend on anyone’s memory.
  • Each time a card change is automatically recorded with a weekly approval before payroll is run.

These three things together create a record that holds up. No dramatic changes are needed, just a documentation standard that finally matches what the legal system actually requires without placing a huge burden on your crew.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleCORE Construction put GNSS in the hands of their superintendents. Here’s what changed.
Next Article Navy awards $118 million contract for drone facilities at Naval Station Norfolk
Machinery Asia
  • Website

Related Posts

Winnipeg awards $580 million biosolids contract after rethinking acquisition

July 21, 2026

Mid-Atlantic municipalities rely on the Vermont contractor

July 21, 2026

New York DDC Commissioner Talks Alternative Delivery, Compressed Timelines

July 21, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Winnipeg awards $580 million biosolids contract after rethinking acquisition

Mid-Atlantic municipalities rely on the Vermont contractor

New York DDC Commissioner Talks Alternative Delivery, Compressed Timelines

The New York contractor tackles big projects with Deep Bench

Popular Posts

Winnipeg awards $580 million biosolids contract after rethinking acquisition

July 21, 2026

Mid-Atlantic municipalities rely on the Vermont contractor

July 21, 2026

New York DDC Commissioner Talks Alternative Delivery, Compressed Timelines

July 21, 2026

The New York contractor tackles big projects with Deep Bench

July 20, 2026
Heavy Machinery

Is a tilt deck trailer better than ramps?

July 17, 2026

What to check before towing a car trailer in the summer

June 24, 2026

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.