Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » Intermountain Health Lutheran Hospital | Engineering News-Register
Industry News

Intermountain Health Lutheran Hospital | Engineering News-Register

Machinery AsiaBy Machinery AsiaMarch 14, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Intermountain Health Lutheran Hospital

Wheat Ridge, Colo.

Health Care


Sent by: Barton Malow | Haselden

Region: ENR Mountain States

Owner: Salut Intermontanya, Cims Region

Main design company: HDR

General contractor: Barton Malow | Haselden, a joint venture

Civil/structural engineer: Martin/Martin Consulting Engineers

MEP Engineer: Cator, Ruma & Associates

Owner’s representative: Cumming Group

Electric: Encore Electric




Skilled labor constraints and supply chain volatility pushed the project team behind this new build to rethink traditional project sequencing. By restructuring how the work was planned and executed, the team says it saved $6 million in project costs while shortening the speed-to-market timeline by four months.

Intermountain Health Lutheran Hospital

Photo courtesy of Dan Schwalm © 2024 HDR

“We deployed a non-traditional construction sequencing, with the building constructed simultaneously from Level 2 down (podium) and Level 3 up (tower) to maximize labor productivity and parallel workflows,” explains Barton Malow Vice President Larry Arndt. The pre-fabrication of almost 25% of the hospital facility components, including enclosures, MEP equipment, MEP racks and patient bathroom pods, was a major factor in saving time and reducing on-site risks.

Intermountain Health Lutheran Hospital

Photo courtesy of Dan Schwalm © 2024 HDR

Covering an area of ​​650,000 square meters, the facility will help expand healthcare services across the region, with 226 beds, 19 postnatal/antenatal beds, 12 NICU beds and 10 operating theatres, along with two dedicated caesarean sections, as well as a streamlined ambulance intake and a heliport.

Intermountain Health Lutheran Hospital

Photo courtesy of Dan Schwalm © 2024 HDR

A close collaboration united all the elements of the project. “Specifically, the Big Room strategy allowed the team to bring all trade partners together ahead of time for regular site walks and address construction, challenges, labor production and design changes in real time. This proactive communication ensured that all trades were included in the process,” adds Arndt.

Looking for quick answers on construction and engineering topics?
Try Ask ENR, our new intelligent AI search tool.

Ask ENR →

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticlePopulus Hotel: Precise coordination keeps systems hidden at Aspen-inspired Denver hotel
Next Article Thomas Brook Rail Bridge Replacement
Machinery Asia
  • Website

Related Posts

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026

Flintco-Mortenson JV begins concrete deck on Oklahoma City’s $900 million NBA stadium

October 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

Kingsport Times News | Local news, weather and sports

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

Blattner is a contractor for the $750 million wind power project in South Dakota

Popular Posts

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

October 17, 2026

Kingsport Times News | Local news, weather and sports

October 17, 2026

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026
Heavy Machinery

How to choose the right car trailer for your vehicle?

October 15, 2026

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.