Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home » Louisiana museum opens after $41 million revitalization
Industry News

Louisiana museum opens after $41 million revitalization

Machinery AsiaBy Machinery AsiaJune 13, 2023No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

The Audubon Aquarium and Insectarium has opened its new museum in downtown New Orleans, Louisiana, following a transformative $41 million project, including a 1,189 m.2 (12,800 square meters) of extension and a 7,618 m2 (82,000 square meters) renovation.

Designed by architecture firm EskewDumezRipple (EDR), in collaboration with architect and exhibition designer, CambridgeSeven, and built by general contractor, Broadmoor, with Dupont-LeCorgne as construction consultant, the project is a revitalization of a civic and cultural facility in New. Downtown Orleans, next to the Mississippi River and the French Quarter.

The project included the relocation of the existing insectarium from its previous home in the Duana on Carrer Canal and the expansion and renovation of the aquarium itself—two vital community offerings housed for the first time under one roof—the project represents the Audubon’s first major renovation. for the aquarium since it opened in 1990.

Along with this new program, the scope covered a crystal-shaped entrance that identified the main entrance hall and the relocated ticketing area. In addition, a grand new lobby staircase and glass bridge were added, the existing Mississippi River gallery was reimagined into a bayou experience; and the Amazon exhibit gallery was updated. Other modifications include the introduction of a new tank experience at the top of the Gulf, two new gift shops and the reversal of the exhibit flow experience in the aquarium’s exhibit spaces.

Beyond the renovated exhibition spaces, a creative infill and reimagining of the former big screen theater allowed for additional programming space to support Audubon in its mission. While an infill of the second floor was used to house an open part of the insectarium, the first floor houses a new multipurpose event space bordering the nearby Woldenberg Park.

Haley Robinson, EDR’s project architect, discussed the effort. “This project was a true collaboration between the client, architect, exhibitor and builder teams. The project provides a new window into Audubon’s exceptional work, its mission of environmental stewardship, and is also a key component of the ongoing revitalization of New Orleans’ riverfront.”

“This project reflects Audubon’s mandate to the design team to reach for the stars and always reflect, [it is] the overarching message and mission of conservation,” says Peter Sollogub, CambridgeSeven’s design director for the project. “Their vision and completion represent engagement and collaboration at their best, using creativity, storytelling and exploration to convey the wonder and wonder of nature to their community.”

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleHello, World! Cars and Trucks
Next Article SARNFANS Funky Colorful Cushion Sport Socks,Athletic Cushioned Running Performance Crew Socks For Men/Women
Machinery Asia
  • Website

Related Posts

PCL, stantec $ 600 million scheme expansion of the San Diego Wastewater Treatment Plant

June 21, 2025

2Q 2025 Cost Report: Executive confidence falls as rules of uncertainty

June 21, 2025

Stay Cable Stay, Bi-Teign chosen for Brent Spence Bridge Connecting Ohio and Kentucky

June 21, 2025
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

PCL, stantec $ 600 million scheme expansion of the San Diego Wastewater Treatment Plant

2Q 2025 Cost Report: Executive confidence falls as rules of uncertainty

Stay Cable Stay, Bi-Teign chosen for Brent Spence Bridge Connecting Ohio and Kentucky

Fisher Sand & Gravel awarded a $ 309 million contract for Tucson border wall work

Popular Posts

PCL, stantec $ 600 million scheme expansion of the San Diego Wastewater Treatment Plant

June 21, 2025

2Q 2025 Cost Report: Executive confidence falls as rules of uncertainty

June 21, 2025

Stay Cable Stay, Bi-Teign chosen for Brent Spence Bridge Connecting Ohio and Kentucky

June 21, 2025

Fisher Sand & Gravel awarded a $ 309 million contract for Tucson border wall work

June 20, 2025
Heavy Machinery

7 Tips to maximize the life of the useful trailer tires

June 20, 2025

The smart way to transport vehicles

June 18, 2025

All you need to know about one -axis utility trailers

June 16, 2025

Smart choice for easy transportation from vehicles

June 16, 2025

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.