Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป McCarthy uses prefabricated components at a $185 million ASU facility
Industry News

McCarthy uses prefabricated components at a $185 million ASU facility

Machinery AsiaBy Machinery AsiaNovember 20, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Please let us know if you have any comments.

McCarthy Building Cos., based in St. Louis, has completed construction of the $185 million Interdisciplinary science and technology building 12a research center on Arizona State University’s polytechnic campus in Mesa, Arizona, according to a Nov. 11 news release.

The 173,194-square-foot building, set to open for the fall 2025 semester, will provide specialized laboratory, research, instructional and collaborative spaces for the school’s students and faculty, according to the news release.

According to McCarthy, the ISTB 12 is the university’s first structure to use several prefabrication innovations, including multi-aisle frames, precast enclosure panels and a recessed aerial uni-strut system.

“As a construction partner, we are proud to deliver a facility that reflects innovation not only in its purpose, but also in the way it was built for opening day and decades of adaptability,” said Carlos Diaz, McCarthy’s project manager, in the press release.

The project took 22 months to complete, according to the release. McCarthy worked alongside the SmithGroup integrated design team to build the ASU structure and addressed supply chain challenges through an early procurement strategy, which McCarthy said helped materials arrive on time and aided in the sequencing of critical electrical and mechanical equipment.

The building will offer a collaborative space for additive manufacturing; robotics for smart manufacturing and industrial automation; cyber manufacturing and operations research; semiconductor manufacturing; and manufacturing systems for the energy sector, according to McCarthy.

Construction also addressed sustainability goals through LEED Gold certification, energy recovery through pre-conditioned exhaust air capture, a building-wide chilled beam system, advanced building controls and solar-ready infrastructure.

This isn’t McCarthy’s only recent higher education project. Earlier this year, the builder began construction on the new San Bernardino Valley College in California. $94 million student services buildingand the company highlighted higher education jobs as a strategic priority for the company.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleWheel Dozer vs. Crawler Dozer
Next Article Interior proposes the revocation of the ESA rules, the restoration of the 2019-2020 framework
Machinery Asia
  • Website

Related Posts

Two Pressures, One Channel: Conservation Meets Geopolitics in Panama

June 24, 2026

State Audit Clouds Future of Proposed NC Outer Banks Bridge

June 24, 2026

Gilbane-Turner JV leases $2.1 million stadium to Buffalo Bills

June 24, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Two Pressures, One Channel: Conservation Meets Geopolitics in Panama

State Audit Clouds Future of Proposed NC Outer Banks Bridge

Gilbane-Turner JV leases $2.1 million stadium to Buffalo Bills

Grant Certainty emerges as new failure in talks on transport project

Popular Posts

Two Pressures, One Channel: Conservation Meets Geopolitics in Panama

June 24, 2026

State Audit Clouds Future of Proposed NC Outer Banks Bridge

June 24, 2026

Gilbane-Turner JV leases $2.1 million stadium to Buffalo Bills

June 24, 2026

Grant Certainty emerges as new failure in talks on transport project

June 24, 2026
Heavy Machinery

What to check before towing a car trailer in the summer

June 24, 2026

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.