Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » McDermott wins Middle East gas contracts in UAE and Cyprus worth up to $1.75 billion
Industry News

McDermott wins Middle East gas contracts in UAE and Cyprus worth up to $1.75 billion

Machinery AsiaBy Machinery AsiaSeptember 13, 2026No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

US-based energy infrastructure contractor McDermott International has in recent weeks been awarded two major contracts in its Middle East region: one from Abu Dhabi National Oil Co. worth more than $1 billion for new work on the United Arab Emirates’ Umm Shaif Integrated Gas Cap and Surface Pressure Boost Project; and another from Italian energy company Eni Ltd., which is expected to be worth up to $750 million to develop the Cronos gas field off the coast of Cyprus in the Mediterranean Sea as a new hub away from the Persian Gulf.

McDermott called the Umm Shaif 4 package a “mega” engineering, procurement, construction and installation contract in a statement last month, adding that the project would increase the country’s gas for domestic use and improve its LNG production and export. It is a layer of natural gas covering an underground oil reservoir that has been operating since 1958 off the coast of Abu Dhabi.

The US company said it and the Qingdao McDermott Wuchuan consortium in China “will provide the full scope for a new surface pressure boosting facility”, including the construction and installation of a jacket and top. . “Once completed, the topside will be among the heaviest offshore modules ever installed in the Middle East, McDermott said.

ADNOC and its partners announced a final investment decision in July for the $6.2 billion offshore project. Furn, owned by the government of the United Arab Emirates, is the operator and owns 60%, with TotalEnergies, Eni and China National Petroleum Corp. the rest

The development of Package 4 will expand production capacity to 600 million standard cubic feet per day, equivalent to approximately 10% of the UAE’s daily consumption. Additional phases could increase output to 1.5 billion standard cubic feet per day, ADNOC said.

Australian engineer and contractor Worley has been involved in the front-end engineering design of the project, according to ADNOC. McDermott’s UAE offices will oversee engineering and project management, with manufacturing taking 24 to 36 months at Qingdao McDermott Wuchuan Consortium’s Qingdao, China yard.

The US contractor said its contract with Eni Cyprus Ltd will boost the development of the new Cronos offshore gas field, discovered in 2022, and estimated at 3 trillion cubic feet. The contract covers the engineering, procurement, construction and installation of subsea infrastructure for the field in southwest Cyprus to enable it to connect to Eni’s existing offshore systems at Egypt’s Zohr gas field.

Gas produced at the Cronos field, due in 2028, will be transported to Zohr via a new pipeline and pumped ashore to be liquefied at Eni’s LNG facility in Damietta, Egypt and exported to Europe via pipelines and regasification units in Greece.

Looking for quick answers on construction and engineering topics?
Try Ask ENR, our new intelligent AI search tool.

Ask ENR →

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleSuspect in North Park backhoe hit-and-run to stand trial
Machinery Asia
  • Website

Related Posts

Engineers, construction trades reflect on industry impacts of 9/11, legacy

September 12, 2026

Engineers, construction trades reflect on industry impacts of 9/11, legacy

September 11, 2026

Lessons learned from rebuilding the Pentagon after 9/11

September 11, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

McDermott wins Middle East gas contracts in UAE and Cyprus worth up to $1.75 billion

Suspect in North Park backhoe hit-and-run to stand trial

Man accused of taking backhoe on a ride released with GPS monitoring device

Ukraine presents the new UAT-SPIDER armored backhoe for position ordering and other engineering work

Popular Posts

McDermott wins Middle East gas contracts in UAE and Cyprus worth up to $1.75 billion

September 13, 2026

Suspect in North Park backhoe hit-and-run to stand trial

September 13, 2026

Man accused of taking backhoe on a ride released with GPS monitoring device

September 13, 2026

Ukraine presents the new UAT-SPIDER armored backhoe for position ordering and other engineering work

September 12, 2026
Heavy Machinery

How to choose the right farm trailer

September 10, 2026

How do you build a generator trailer for heavy rear loads?

September 7, 2026

What size car trailer load winch do you need?

July 29, 2026

How to choose a manual winch for your car trailer loading needs

July 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.