Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home » Merit Award, Manufacturing: Expansió Zoetis
Industry News

Merit Award, Manufacturing: Expansió Zoetis

Machinery AsiaBy Machinery AsiaDecember 15, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Zoetis expansion

Tullamore, Ireland

Merit Award


Sent by: Jacobs

Owner: Zoetis Inc.

Leading design company | Contractor: Jacobs


Subcontractors: Jones Engineering; Kirby Engineering; PJ Hegarty; Ward and Burke; Ardmac; Mercury Engineering



The team behind this 8,500 square meter single-use monoclonal antibody biotech production facility for animal drugs needed to meet their schedule goals so the owner could meet the commercialization of the product as soon as possible. While similar projects of this scale typically take 30-36 months to complete, the team at this plant was able to complete it in just 23 months.

To achieve this, the team used an integrated project delivery approach, which they say promoted communication and collaboration. There was a lot of overlap between the design and construction phases, but little room for schedule deviation, so team members selected business partners who could meet the design assistance requirements.

They used a federated building information model, with Jacobs acting as the design integrator. Each commercial contractor uploaded their individual design models to the federated model daily to enable coordination and allow designers to resolve any issues.

The team also fabricated equipment off-site at the same time as the building shell and core construction, further helping to move work forward efficiently. According to the team, the billing involved 2,119 test packages, with 192 construction billing packages used for 232 building systems, equipment and utilities.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest Project, Sports/Entertainment: Rogers Center Renovation Phase 2
Next Article Merit Award, Water/Wastewater: Musaimeer Pumping Station and Outfall
Machinery Asia
  • Website

Related Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Amtrak updates $6 million Baltimore tunnel project

Trump unveils plans for $22.5 million Dulles airport overhaul

Turner’s cost benchmark rose 5.2% in the second quarter

Inspector dead, four workers injured in Kansas interstate construction zone crash

Popular Posts

Amtrak updates $6 million Baltimore tunnel project

July 30, 2026

Trump unveils plans for $22.5 million Dulles airport overhaul

July 30, 2026

Turner’s cost benchmark rose 5.2% in the second quarter

July 30, 2026

Inspector dead, four workers injured in Kansas interstate construction zone crash

July 30, 2026
Heavy Machinery

What size car trailer load winch do you need?

July 29, 2026

How to choose a manual winch for your car trailer loading needs

July 27, 2026

How to choose heavy-duty car tow ramps for safe loading

July 27, 2026

What width car trailer do you need for your vehicle?

July 27, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.