Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home » Merit Award, Manufacturing: Expansió Zoetis
Industry News

Merit Award, Manufacturing: Expansió Zoetis

Machinery AsiaBy Machinery AsiaDecember 15, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

Zoetis expansion

Tullamore, Ireland

Merit Award


Sent by: Jacobs

Owner: Zoetis Inc.

Leading design company | Contractor: Jacobs


Subcontractors: Jones Engineering; Kirby Engineering; PJ Hegarty; Ward and Burke; Ardmac; Mercury Engineering



The team behind this 8,500 square meter single-use monoclonal antibody biotech production facility for animal drugs needed to meet their schedule goals so the owner could meet the commercialization of the product as soon as possible. While similar projects of this scale typically take 30-36 months to complete, the team at this plant was able to complete it in just 23 months.

To achieve this, the team used an integrated project delivery approach, which they say promoted communication and collaboration. There was a lot of overlap between the design and construction phases, but little room for schedule deviation, so team members selected business partners who could meet the design assistance requirements.

They used a federated building information model, with Jacobs acting as the design integrator. Each commercial contractor uploaded their individual design models to the federated model daily to enable coordination and allow designers to resolve any issues.

The team also fabricated equipment off-site at the same time as the building shell and core construction, further helping to move work forward efficiently. According to the team, the billing involved 2,119 test packages, with 192 construction billing packages used for 232 building systems, equipment and utilities.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest Project, Sports/Entertainment: Rogers Center Renovation Phase 2
Next Article Merit Award, Water/Wastewater: Musaimeer Pumping Station and Outfall
Machinery Asia
  • Website

Related Posts

Bedrock robotic excavators remove 65,000 cubic meters of dirt at Southwest project

November 18, 2025

Amtrak disputes MTA over Penn Station access delay, calls for retraction

November 18, 2025

DOTs paused DBE targets to recertify companies

November 18, 2025
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Bedrock robotic excavators remove 65,000 cubic meters of dirt at Southwest project

Amtrak disputes MTA over Penn Station access delay, calls for retraction

DOTs paused DBE targets to recertify companies

Bedrock Robotic Excavators Remove 65,000 Tons of Dirt at Southwest Project

Popular Posts

Bedrock robotic excavators remove 65,000 cubic meters of dirt at Southwest project

November 18, 2025

Amtrak disputes MTA over Penn Station access delay, calls for retraction

November 18, 2025

DOTs paused DBE targets to recertify companies

November 18, 2025

Bedrock Robotic Excavators Remove 65,000 Tons of Dirt at Southwest Project

November 18, 2025
Heavy Machinery

Where can I find reliable mini excavator dealers near me?

October 27, 2025

The complete expert guide to faster and smarter cargo transportation

October 27, 2025

Understand the weight of aluminum car trailers

October 20, 2025

The difference in dimensions between a Lowboy and RGN trailer

October 15, 2025

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.