Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home » Merit K-12 – CO Greenfield Academy
Industry News

Merit K-12 – CO Greenfield Academy

Machinery AsiaBy Machinery AsiaOctober 29, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

CO Greenfield Academy of Design and Innovation – Campus Redevelopment

phoenix

Merit Award


Sent by: CHASSE construction equipment

Owner: Roosevelt Elementary School District

Main design company: Orcutt Winslow Architects

General contractor: CHASSE construction equipment; RYTAN construction

Civil Engineer: EPS Group

Structural Engineer: TRC Worldwide Engineering Inc.

MEP Engineer: MSA/IMEG Engineering Consultants

Owner Management Group: FMG group




The $27 million reconstruction effort that provided a 72,000-square-foot educational facility on a 10.5-acre site was completed in just 12 months. The public high school now serves more than 500 students in grades four through eight with a STEM curriculum. Completed in two phases, the project has two main buildings. One serves as the main space for STEM exploration and learning, and the second is dedicated to school administration and a cafeteria.

Operating between two active campuses and a neighborhood, the team planned extensively to meet community rules and time limits during construction. Balancing aesthetics and functionality on a tight budget, the team sourced alternative products whenever possible. One strategy was to turn to local suppliers, which helped the budget and the community. Establishing a project environment that encouraged collaboration was also vital. Rather than creating a fortress, the design team tried to balance the inclusion of robust security measures that included controlled access points, surveillance systems and emergency response protocols. Operable glass walls maintained visual connections between occupants and provided plenty of natural light.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest Interiors: Phoenix Children’s Hospital
Next Article Best Landscape/Urban Development – Clark Park
Machinery Asia
  • Website

Related Posts

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026

Flintco-Mortenson JV begins concrete deck on Oklahoma City’s $900 million NBA stadium

October 16, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

Kingsport Times News | Local news, weather and sports

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

Blattner is a contractor for the $750 million wind power project in South Dakota

Popular Posts

Thieves use backhoe in attempted ATM robbery in Trinidad and Tobago | news

October 17, 2026

Kingsport Times News | Local news, weather and sports

October 17, 2026

13-year, $2 million New York Bridge rehab completes eighth of 11 projects

October 16, 2026

Blattner is a contractor for the $750 million wind power project in South Dakota

October 16, 2026
Heavy Machinery

How to choose the right car trailer for your vehicle?

October 15, 2026

How to choose between single axle and tandem axle trailers

September 30, 2026

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.