Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
Machinery Asia
You are at:Home » Merit K-12 – CO Greenfield Academy
Industry News

Merit K-12 – CO Greenfield Academy

Machinery AsiaBy Machinery AsiaOctober 29, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

CO Greenfield Academy of Design and Innovation – Campus Redevelopment

phoenix

Merit Award


Sent by: CHASSE construction equipment

Owner: Roosevelt Elementary School District

Main design company: Orcutt Winslow Architects

General contractor: CHASSE construction equipment; RYTAN construction

Civil Engineer: EPS Group

Structural Engineer: TRC Worldwide Engineering Inc.

MEP Engineer: MSA/IMEG Engineering Consultants

Owner Management Group: FMG group




The $27 million reconstruction effort that provided a 72,000-square-foot educational facility on a 10.5-acre site was completed in just 12 months. The public high school now serves more than 500 students in grades four through eight with a STEM curriculum. Completed in two phases, the project has two main buildings. One serves as the main space for STEM exploration and learning, and the second is dedicated to school administration and a cafeteria.

Operating between two active campuses and a neighborhood, the team planned extensively to meet community rules and time limits during construction. Balancing aesthetics and functionality on a tight budget, the team sourced alternative products whenever possible. One strategy was to turn to local suppliers, which helped the budget and the community. Establishing a project environment that encouraged collaboration was also vital. Rather than creating a fortress, the design team tried to balance the inclusion of robust security measures that included controlled access points, surveillance systems and emergency response protocols. Operable glass walls maintained visual connections between occupants and provided plenty of natural light.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest Interiors: Phoenix Children’s Hospital
Next Article Best Landscape/Urban Development – Clark Park
Machinery Asia
  • Website

Related Posts

Of the archives: October 22, 1925 | Concrete mixture

May 22, 2025

GRANIT COO JIM RADICH to remove —

May 22, 2025

The renewal of Boston $ 200 million women’s football stadium will not be ready for the opening season

May 22, 2025
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Of the archives: October 22, 1925 | Concrete mixture

GRANIT COO JIM RADICH to remove —

The renewal of Boston $ 200 million women’s football stadium will not be ready for the opening season

Make breaks, Buddy Up: Tips to overcome the heat

Popular Posts

Of the archives: October 22, 1925 | Concrete mixture

May 22, 2025

GRANIT COO JIM RADICH to remove —

May 22, 2025

The renewal of Boston $ 200 million women’s football stadium will not be ready for the opening season

May 22, 2025

Make breaks, Buddy Up: Tips to overcome the heat

May 22, 2025
Heavy Machinery

All you need to know about a 28 -foot car trailer

May 21, 2025

All you need to know about a car trailer

May 21, 2025

Cart of car and useful trailer: What do you need?

May 19, 2025

The definitive guide to choose and use -no a

May 15, 2025

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.