Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • News & Media
Machinery Asia
You are at:Home ยป Merit K-12 – CO Greenfield Academy
Industry News

Merit K-12 – CO Greenfield Academy

Machinery AsiaBy Machinery AsiaOctober 29, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

CO Greenfield Academy of Design and Innovation – Campus Redevelopment

phoenix

Merit Award


Sent by: CHASSE construction equipment

Owner: Roosevelt Elementary School District

Main design company: Orcutt Winslow Architects

General contractor: CHASSE construction equipment; RYTAN construction

Civil Engineer: EPS Group

Structural Engineer: TRC Worldwide Engineering Inc.

MEP Engineer: MSA/IMEG Engineering Consultants

Owner Management Group: FMG group




The $27 million reconstruction effort that provided a 72,000-square-foot educational facility on a 10.5-acre site was completed in just 12 months. The public high school now serves more than 500 students in grades four through eight with a STEM curriculum. Completed in two phases, the project has two main buildings. One serves as the main space for STEM exploration and learning, and the second is dedicated to school administration and a cafeteria.

Operating between two active campuses and a neighborhood, the team planned extensively to meet community rules and time limits during construction. Balancing aesthetics and functionality on a tight budget, the team sourced alternative products whenever possible. One strategy was to turn to local suppliers, which helped the budget and the community. Establishing a project environment that encouraged collaboration was also vital. Rather than creating a fortress, the design team tried to balance the inclusion of robust security measures that included controlled access points, surveillance systems and emergency response protocols. Operable glass walls maintained visual connections between occupants and provided plenty of natural light.

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleBest Interiors: Phoenix Children’s Hospital
Next Article Best Landscape/Urban Development – Clark Park
Machinery Asia
  • Website

Related Posts

Three workers die in tractor-trailer accident in California I-10 work zone

September 28, 2026

Fluor, Balfour Beatty Completes $677 Million Texas Highway Project

September 28, 2026

Aecon, AtkinsRealis lead Ontario’s $19 million Pickering nuclear power plant overhaul

September 28, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

Case’s Dolan replaced by Cat’s Dahl

Custom trailers designed for the way you work

Three workers die in tractor-trailer accident in California I-10 work zone

Fluor, Balfour Beatty Completes $677 Million Texas Highway Project

Popular Posts

Case’s Dolan replaced by Cat’s Dahl

September 29, 2026

Custom trailers designed for the way you work

September 29, 2026

Three workers die in tractor-trailer accident in California I-10 work zone

September 28, 2026

Fluor, Balfour Beatty Completes $677 Million Texas Highway Project

September 28, 2026
Heavy Machinery

Custom trailers designed for the way you work

September 29, 2026

Daily Trailer Knowledge: Something About Trailer Tires

September 22, 2026

2 Place Car Trailer: How To Choose The Right Two Car Transporter For Vehicle Transport?

September 22, 2026

3-Car Wedge Trailer: How can it improve vehicle transportation efficiency?

September 21, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.