Close Menu
Machinery Asia
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Machinery Asia
Subscribe
  • Home
  • Industry News
  • Heavy Machinery
  • Backhoe Loader
  • Excavators
  • Skid Steer
  • Videos
  • Shopping
  • News & Media
Machinery Asia
You are at:Home ยป Met
Industry News

Met

Machinery AsiaBy Machinery AsiaAugust 21, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Tumblr

This audio is automatically generated. Do us know if you have comments.

Brief of diving:

  • The Meta Social Networks Giant will associate with the Silicon Ranch Silicon and Silicon Energy Infrastructure to bring a 100 megawatt solar farm to South Carolina to help the Power Meta Data Center in the State, Silicon Ranch announced Tuesday.
  • Silicon Ranch investments $ 100 million in the county of Orangeburg, South Carolina and Meta will receive all renewable energy credits in the installation, according to the statement. Silicon Ranch told Tuesday on Tuesday, the project will not require community or public services investments.
  • The solar farm is expected to come online in 2027, the same year as the Meta Data Center in Aiken, South Carolina. Meta recently said piloted the use of massive wood Build an administration building on the Aiken Campus of the Future Data Center.

Divide vision:

Meta, owner of social media platforms Facebook, Instagram and WhatsApp-is one of the biggest corporate renewable energy buyers and reported net-zero 1 emissions and scope 2 2024 Environmental Report.

The agreement is the 18th between Silicon Ranch and Meta, which collectively represent “more than 1,500 MW of renewable energy capacity” and $ 2.5 billion in silicon ranch investments, according to the announcement. Collaborations include energy infrastructure projects in Georgia, Tennessee, Kentucky and the new South Carolina Solar Farm. Silicon Ranch, based in Nashville, Tennessee, told Tor Dive that not all projects have been publicly announced.

“This agreement reflects the fact that an energy strategy of everything that is needed is necessary to nourish our growing economy,” said Silicon Ranch in an email. “Today, our country needs more energy than ever, and we can do it in a way that supports North -American Manufacture, strengthens our infrastructure and provides jobs and investments in rural communities.”

Central Electric Power Cooperative, Columbia, South Carolina, Energy Generation and Transmission Cooperative, is also a member of the agreement and will acquire energy on the solar farm for his portfolio of members, according to the statement. Central Electric represents 19 electricity distribution cooperatives throughout the state, included Aiken Electric Cooperative, which will serve at the Meta Data Center.

For the goal, the agreement follows a July announcement to buy all the energy generated by a 600 MW solar plant built in Texas by Enbridge. Enbridge, based in Alberta, announced a $ 900 million investment to complete the project, which is also expected to come online by 2027.

Both offers follow the passage last month of a republican budget law, which created new restrictions for wind and solar projects To obtain the tax credits previously promulgated. The Treasury Department recently published new guidelines on what is described as “construction” for the goal of the new law, saying the construction of wind and plot “Begins when important physical work begins. “”

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleVolvo 20-ton excavator range: versatility
Next Article mitsubishi super HDX#shorts
Machinery Asia
  • Website

Related Posts

33,000-seat tennis center with retractable roof spaces planned in Saudi Arabia

June 20, 2026

Project cost, risk responsibility was discussed at the Resilience Conference

June 19, 2026

Clayco recruits former OpenAI executive Zack Kass as board advisor

June 19, 2026
Leave A Reply Cancel Reply

  • Facebook
  • Twitter
  • Instagram
  • Pinterest
Don't Miss

33,000-seat tennis center with retractable roof spaces planned in Saudi Arabia

Project cost, risk responsibility was discussed at the Resilience Conference

Clayco recruits former OpenAI executive Zack Kass as board advisor

Saudi Arabia’s Qiddiya plans 33,000-seat tennis center with retractable roof venues

Popular Posts

33,000-seat tennis center with retractable roof spaces planned in Saudi Arabia

June 20, 2026

Project cost, risk responsibility was discussed at the Resilience Conference

June 19, 2026

Clayco recruits former OpenAI executive Zack Kass as board advisor

June 19, 2026

Saudi Arabia’s Qiddiya plans 33,000-seat tennis center with retractable roof venues

June 19, 2026
Heavy Machinery

Why dump trailer maintenance is important for long-term use

June 17, 2026

Top 5 Trailer Safety Mistakes to Avoid Before Towing

June 11, 2026

How to Choose a Gooseneck Tilt Equipment Trailer for Your Business

June 8, 2026

As a double-axle tilting trailer facilitates the transport of vehicles and equipment

June 5, 2026

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Type above and press Enter to search. Press Esc to cancel.